Difference between revisions of "BLTWG Meeting 10/16/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 13: Line 13:
 
<br>
 
<br>
 
----
 
----
 +
 +
===Action list===
 +
 +
# First draft of the TDR sections are due by Monday, Oct. 20 to Jim Stewart.  Jim will collect the results and build a unified draft document for everyone to review, starting Monday.
 +
# Tagger magnet specs on the wiki are out of date, applying to the two-dipole design.  Jim will get the revised specs from Tim and update the wiki page.

Latest revision as of 11:19, 16 October 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Jim S., Alex S., Richard J., Dan S., Guangliang Y., Hrachya H., Franz K.

Agenda

  1. Writing reports - everyone
  2. Changes to the dry run schedule -- Jim
  3. Updated tagger drawings - Tim,Franz
  4. Collimator simulation results - Alexander
  5. Diamond thickness and multiple scattering update - Richard



Action list

  1. First draft of the TDR sections are due by Monday, Oct. 20 to Jim Stewart. Jim will collect the results and build a unified draft document for everyone to review, starting Monday.
  2. Tagger magnet specs on the wiki are out of date, applying to the two-dipole design. Jim will get the revised specs from Tim and update the wiki page.