Difference between revisions of "BLTWG Meeting 2/13/2017"

From GlueXWiki
Jump to: navigation, search
(Notes)
Line 31: Line 31:
  
 
=== Notes ===
 
=== Notes ===
 +
 +
Things we did not get to, but that we may want to discuss at some future beamline meeting include the following.
 +
 +
# The rate difference with different diamond orientations (entries 3456227, 3457757, 3457790)
 +
# The beam energy for this run (latest entry: 3457959). Also the BEM fix (scheduled for Thu. 21st) and its recent failures (entries 3456851, 3457107).
 +
# Soft photon background (induce satellite peaks on profiler and the rate difference with different diamond orientations).
 +
# System failures (PS power supply, target IOC).

Revision as of 14:37, 13 February 2017

Organization

  • Time: 11:30 EDT
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Richard J., Brendan P., Hovanes E., Alexandre D., Nathan S., Alex B., and Eugene C.

Agenda

  1. Announcements
  2. Collaboration Meeting February 16-18
  3. Brief review of progress with beam conditions during run - discussion
  4. Polarization from beam-collimator misalignment - Richard J.
  1. Update on hodoscope calibrations - Nathan S.
  2. Update on microscope initial calibrations - Alex B.
  3. Update on PS calibration and TAC measurements - Sascha S.
  4. Consistent inclusion of phonon radiation in coherent bremsstrahlung - Richard J.
  5. Progress toward integrated beamline simulation - Richard J.
  6. Progress toward determination of the PS acceptance - Alex S.
  7. Progress toward a common beam energy scale - Richard J.
  8. Any other business

Notes

Things we did not get to, but that we may want to discuss at some future beamline meeting include the following.

  1. The rate difference with different diamond orientations (entries 3456227, 3457757, 3457790)
  2. The beam energy for this run (latest entry: 3457959). Also the BEM fix (scheduled for Thu. 21st) and its recent failures (entries 3456851, 3457107).
  3. Soft photon background (induce satellite peaks on profiler and the rate difference with different diamond orientations).
  4. System failures (PS power supply, target IOC).