Difference between revisions of "Bill's to do list"
From GlueXWiki
Line 9: | Line 9: | ||
#* <strike> Recover PMT #9 and 10 and perform test.</strike> | #* <strike> Recover PMT #9 and 10 and perform test.</strike> | ||
#* Spare micro-BNC cable for the big box. (Omen) | #* Spare micro-BNC cable for the big box. (Omen) | ||
− | #* Cleaning of the mirrors. (Greg, Keith) | + | #* <strike> Cleaning of the mirrors. (Greg, Keith) </strike> |
#* Remarking and repositioning the Fiber cable label. (Fernando/Chris) | #* Remarking and repositioning the Fiber cable label. (Fernando/Chris) | ||
#* PMT mounting plate spacer (Bobby) | #* PMT mounting plate spacer (Bobby) | ||
#* Installation tray. (Mark/Keith) | #* Installation tray. (Mark/Keith) | ||
#* Installation spacer. (Bobby) | #* Installation spacer. (Bobby) |
Revision as of 10:10, 17 December 2018
- Priority list:
- Laser alignment and generating mis-alignment table (Bill, Andrew).
- Feedthrough opening angle measurement and fish tank (Bill, Fernando).
- Light monitors testing and mounting (Bill, Keith).
- DIRC module cabling strategy (Bill/Andrew).
- Hole opening on the backplate (Keith).
- Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
- Plastic bolts and screws for the FPGA board. (Chris)
-
Recover PMT #9 and 10 and perform test. - Spare micro-BNC cable for the big box. (Omen)
-
Cleaning of the mirrors. (Greg, Keith) - Remarking and repositioning the Fiber cable label. (Fernando/Chris)
- PMT mounting plate spacer (Bobby)
- Installation tray. (Mark/Keith)
- Installation spacer. (Bobby)