Difference between revisions of "Bill's to do list"

From GlueXWiki
Jump to: navigation, search
(Created page with "Priority list: 1. Laser alignment and generating mis-alignment table 2. Feedthrough opening angle measurement and fish tank. 3. Light monitors testing and mounting 4. DIRC mod...")
 
Line 1: Line 1:
Priority list:
+
# Priority list:
1. Laser alignment and generating mis-alignment table
+
#* Laser alignment and generating mis-alignment table
2. Feedthrough opening angle measurement and fish tank.
+
#* Feedthrough opening angle measurement and fish tank.
3. Light monitors testing and mounting
+
#* Light monitors testing and mounting
4. DIRC module cabling strategy.
+
#* DIRC module cabling strategy.
5. Hole opening on the backplate.
+
#* Hole opening on the backplate.
6. Hole opening on the of the PMT mounting plate.
+
#* Hole opening on the of the PMT mounting plate.
7. Plastic bolts and screws for the FPGA board.
+
#* Plastic bolts and screws for the FPGA board.
8. Recover PMT #9 and 10 and perform test.
+
#* Recover PMT #9 and 10 and perform test.
9. Spare micro-BNC cable for the big box.
+
#* Spare micro-BNC cable for the big box.
10. Cleaning of the mirrors.
+
#* Cleaning of the mirrors.
11. Remarking the Fiber cable label.
+
#* Remarking the Fiber cable label.
12. Installation tray.
+
#* Installation tray.
13. Installation sheets.
+
#* Installation sheets.

Revision as of 17:20, 7 December 2018

  1. Priority list:
    • Laser alignment and generating mis-alignment table
    • Feedthrough opening angle measurement and fish tank.
    • Light monitors testing and mounting
    • DIRC module cabling strategy.
    • Hole opening on the backplate.
    • Hole opening on the of the PMT mounting plate.
    • Plastic bolts and screws for the FPGA board.
    • Recover PMT #9 and 10 and perform test.
    • Spare micro-BNC cable for the big box.
    • Cleaning of the mirrors.
    • Remarking the Fiber cable label.
    • Installation tray.
    • Installation sheets.