Difference between revisions of "Bill's to do list"
From GlueXWiki
(Created page with "Priority list: 1. Laser alignment and generating mis-alignment table 2. Feedthrough opening angle measurement and fish tank. 3. Light monitors testing and mounting 4. DIRC mod...") |
|||
Line 1: | Line 1: | ||
− | Priority list: | + | # Priority list: |
− | + | #* Laser alignment and generating mis-alignment table | |
− | + | #* Feedthrough opening angle measurement and fish tank. | |
− | + | #* Light monitors testing and mounting | |
− | + | #* DIRC module cabling strategy. | |
− | + | #* Hole opening on the backplate. | |
− | + | #* Hole opening on the of the PMT mounting plate. | |
− | + | #* Plastic bolts and screws for the FPGA board. | |
− | + | #* Recover PMT #9 and 10 and perform test. | |
− | + | #* Spare micro-BNC cable for the big box. | |
− | + | #* Cleaning of the mirrors. | |
− | + | #* Remarking the Fiber cable label. | |
− | + | #* Installation tray. | |
− | + | #* Installation sheets. |
Revision as of 17:20, 7 December 2018
- Priority list:
- Laser alignment and generating mis-alignment table
- Feedthrough opening angle measurement and fish tank.
- Light monitors testing and mounting
- DIRC module cabling strategy.
- Hole opening on the backplate.
- Hole opening on the of the PMT mounting plate.
- Plastic bolts and screws for the FPGA board.
- Recover PMT #9 and 10 and perform test.
- Spare micro-BNC cable for the big box.
- Cleaning of the mirrors.
- Remarking the Fiber cable label.
- Installation tray.
- Installation sheets.