Difference between revisions of "Bill's to do list"

From GlueXWiki
Jump to: navigation, search
(2018)
(2018)
Line 9: Line 9:
 
#* Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
 
#* Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
 
#* Plastic bolts and screws for the FPGA board. (Chris)
 
#* Plastic bolts and screws for the FPGA board. (Chris)
#* <strike> Recover PMT #9 and 10 and perform test
+
#* Recover PMT #9 and 10 and perform test
 
#* Spare micro-BNC cable for the big box. (Omen)
 
#* Spare micro-BNC cable for the big box. (Omen)
#* <strike> Cleaning of the mirrors. (Greg, Keith)  
+
#* Cleaning of the mirrors. (Greg, Keith)  
 
#* Remarking and repositioning the Fiber cable label. (Fernando/Chris)
 
#* Remarking and repositioning the Fiber cable label. (Fernando/Chris)
 
#* PMT mounting plate spacer (Bobby)
 
#* PMT mounting plate spacer (Bobby)

Revision as of 12:56, 31 January 2020

2018

  1. Priority list:
    • Laser alignment and generating mis-alignment table (Bill, Andrew).
    • Feedthrough opening angle measurement and fish tank (Bill, Fernando).
    • Light monitors testing and mounting (Bill, Keith).
    • DIRC module cabling strategy (Bill/Andrew).
    • Hole opening on the backplate (Keith).
    • Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
    • Plastic bolts and screws for the FPGA board. (Chris)
    • Recover PMT #9 and 10 and perform test
    • Spare micro-BNC cable for the big box. (Omen)
    • Cleaning of the mirrors. (Greg, Keith)
    • Remarking and repositioning the Fiber cable label. (Fernando/Chris)
    • PMT mounting plate spacer (Bobby)
    • Installation tray. (Mark/Keith)
    • Installation spacer. (Bobby)

2019

2020