Difference between revisions of "Bill's to do list"

From GlueXWiki
Jump to: navigation, search
(2019)
(2019)
Line 20: Line 20:
 
* Temperature reduction for the DIRC FPGAs.
 
* Temperature reduction for the DIRC FPGAs.
 
* Water quality setup, 3D printing the box.  
 
* Water quality setup, 3D printing the box.  
* Darkening. &#10004
+
* Darkening. <span>&#10003;</span>
* Uni-strut reinforcement for the distribution boxes.&#10004
+
* Uni-strut reinforcement for the distribution boxes. <span>&#10003;</span>
* Airflow sensor &#10004
+
* Airflow sensor <span>&#10003;</span>
 
*Opening both DIRC boxes in January:
 
*Opening both DIRC boxes in January:
** Check mirror quality &#10004
+
** Check mirror quality <span>&#10003;</span>
** Check anodize quality &#10004
+
** Check anodize quality <span>&#10003;</span>
** Check water tightness of the diffuser assembly. &#10004
+
** Check water tightness of the diffuser assembly. <span>&#10003;</span>
 
*North Box:  
 
*North Box:  
**Check corner interference. &#10004
+
**Check corner interference. <span>&#10003;</span>
**Silicone around the wielding spot.&#10004 <span>&#10003;</span>  
+
**Silicone around the wielding spot. <span>&#10003;</span>  
 
*South Box:
 
*South Box:
 
**Check the chipped corner water seal for both spots
 
**Check the chipped corner water seal for both spots
  
 
==2020==
 
==2020==

Revision as of 13:02, 31 January 2020

2018

  1. Priority list:
    • Laser alignment and generating mis-alignment table (Bill, Andrew).
    • Feedthrough opening angle measurement and fish tank (Bill, Fernando).
    • Light monitors testing and mounting (Bill, Keith).
    • DIRC module cabling strategy (Bill/Andrew).
    • Hole opening on the backplate (Keith).
    • Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
    • Plastic bolts and screws for the FPGA board. (Chris)
    • Recover PMT #9 and 10 and perform test
    • Spare micro-BNC cable for the big box. (Omen)
    • Cleaning of the mirrors. (Greg, Keith)
    • Remarking and repositioning the Fiber cable label. (Fernando/Chris)
    • PMT mounting plate spacer (Bobby)
    • Installation tray. (Mark/Keith)
    • Installation spacer. (Bobby)

2019

  • Temperature reduction for the DIRC FPGAs.
  • Water quality setup, 3D printing the box.
  • Darkening.
  • Uni-strut reinforcement for the distribution boxes.
  • Airflow sensor
  • Opening both DIRC boxes in January:
    • Check mirror quality
    • Check anodize quality
    • Check water tightness of the diffuser assembly.
  • North Box:
    • Check corner interference.
    • Silicone around the wielding spot.
  • South Box:
    • Check the chipped corner water seal for both spots

2020