Bill's to do list

From GlueXWiki
Revision as of 17:19, 7 December 2018 by Billlee (Talk | contribs) (Created page with "Priority list: 1. Laser alignment and generating mis-alignment table 2. Feedthrough opening angle measurement and fish tank. 3. Light monitors testing and mounting 4. DIRC mod...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Priority list: 1. Laser alignment and generating mis-alignment table 2. Feedthrough opening angle measurement and fish tank. 3. Light monitors testing and mounting 4. DIRC module cabling strategy. 5. Hole opening on the backplate. 6. Hole opening on the of the PMT mounting plate. 7. Plastic bolts and screws for the FPGA board. 8. Recover PMT #9 and 10 and perform test. 9. Spare micro-BNC cable for the big box. 10. Cleaning of the mirrors. 11. Remarking the Fiber cable label. 12. Installation tray. 13. Installation sheets.