Bill's to do list

From GlueXWiki
Revision as of 12:56, 31 January 2020 by Billlee (Talk | contribs) (2018)

Jump to: navigation, search

2018

  1. Priority list:
    • Laser alignment and generating mis-alignment table (Bill, Andrew).
    • Feedthrough opening angle measurement and fish tank (Bill, Fernando).
    • Light monitors testing and mounting (Bill, Keith).
    • DIRC module cabling strategy (Bill/Andrew).
    • Hole opening on the backplate (Keith).
    • Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
    • Plastic bolts and screws for the FPGA board. (Chris)
    • Recover PMT #9 and 10 and perform test
    • Spare micro-BNC cable for the big box. (Omen)
    • Cleaning of the mirrors. (Greg, Keith)
    • Remarking and repositioning the Fiber cable label. (Fernando/Chris)
    • PMT mounting plate spacer (Bobby)
    • Installation tray. (Mark/Keith)
    • Installation spacer. (Bobby)

2019

2020