Difference between revisions of "CDC Construction"
From GlueXWiki
(→Fabrication Documentation) |
(→Fabrication Documentation) |
||
Line 10: | Line 10: | ||
* Assembly documents | * Assembly documents | ||
** Final | ** Final | ||
− | *** [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final CDC Drawings] | + | *** [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final CDC Drawings (old directory, viewable from JLab only)] |
− | *** [https://userweb.jlab.org/~vgr/ Final CDC Drawings ( | + | *** [https://userweb.jlab.org/~vgr/ Final CDC Drawings (new directory for the later stages of construction)] |
*** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1451 End plate Alignment] | *** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1451 End plate Alignment] | ||
*** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1625 Straw Insertion] | *** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1625 Straw Insertion] |
Revision as of 09:54, 29 September 2011
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
Fabrication Documentation
- Assembly documents
- Final
- Preliminary
- QA Documents