* [[CDC_Construction_Complications_Tracking | Log of Construction Complications]] | * [[CDC_Construction_Complications_Tracking | Log of Construction Complications]] | ||
* The documentation provided by CMU to Jefferson Lab as part of the [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 CMU Contract Submission]. | * The documentation provided by CMU to Jefferson Lab as part of the [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 CMU Contract Submission]. | ||
+ | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2533 CDC Shipping List] Delivery documentation accompanying the CDC | ||
==== Fabrication Documentation ==== | ==== Fabrication Documentation ==== | ||
* Assembly documents | * Assembly documents |
Revision as of 10:28, 14 August 2014
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
- CDC Shipping List Delivery documentation accompanying the CDC
Fabrication Documentation
- Assembly documents
- Final
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)
- End plate Alignment
- Straw Preparation (clean & trim)
- Glueing Donuts into Straws
- Straw Insertion
- Outer Shell Installation
- Wire Stringing Details
- Summary of Tests
- Document describing the measurement of wire tensions
- Preliminary
- Final
- QA Documents
Production Documents
- Conducting Epoxy Order Schedule
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)