Difference between revisions of "CDC Construction"
From GlueXWiki
(→Photographs) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(19 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
* [[CDC Fabrication Readiness Review]] (Pittsburgh, 21 October, 2010) | * [[CDC Fabrication Readiness Review]] (Pittsburgh, 21 October, 2010) | ||
* [[CDC_Construction_Details | Details of the CDC Construction]] | * [[CDC_Construction_Details | Details of the CDC Construction]] | ||
− | * Submitted | + | * [[CDC_Monthly_Reports | Submitted Monthly Reports]] |
− | ** The documentation provided by CMU to Jefferson Lab as part of the [ | + | * [[CDC_Construction_Complications_Tracking | Log of Construction Complications]] |
+ | * The documentation provided by CMU to Jefferson Lab as part of the [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1438 CMU Contract Submission]. | ||
+ | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2533 CDC Shipping List] Delivery documentation accompanying the CDC | ||
==== Fabrication Documentation ==== | ==== Fabrication Documentation ==== | ||
* Assembly documents | * Assembly documents | ||
− | ** [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final CDC Drawings] | + | ** Final |
− | ** [ | + | *** [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final CDC Drawings (original repository, viewable from JLab only)] |
− | ** [ | + | *** [https://userweb.jlab.org/~vgr/ Final CDC Drawings (for the later stages of construction)] |
− | ** [ | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1451 End plate Alignment] |
− | ** [ | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1624 Straw Preparation (clean & trim)] |
− | ** [[Media:tension_measurement.pdf | Document describing the measurement | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1623 Glueing Donuts into Straws] |
− | * | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1625 Straw Insertion] |
− | ** [ | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1628 Outer Shell Installation] |
− | ** [ | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1441 Wire Stringing Details] |
− | ** [ | + | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1442 Summary of Tests] |
+ | *** [[Media:tension_measurement.pdf | Document describing the measurement of wire tensions]] | ||
+ | ** Preliminary | ||
+ | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1280 CDC Assembly (overview)] | ||
+ | *** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1633 Downstream Plenum Installation] | ||
+ | |||
+ | * QA Documents | ||
+ | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1532 Straw-tube acceptance checks] | ||
+ | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1533 Aluminum Donut acceptance checks] | ||
+ | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1534 Aluminum Feedthru acceptance checks] | ||
+ | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1442 Assembly Tests Summary] | ||
+ | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1862 Wire Tension Measurements] | ||
==== Production Documents ==== | ==== Production Documents ==== | ||
− | * [ | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1537 Conducting Epoxy Order Schedule] |
− | * [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final Drawings] | + | * [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final CDC Drawings (original repository, viewable from JLab only)] |
+ | * [https://userweb.jlab.org/~vgr/ Final CDC Drawings (for the later stages of construction)] | ||
==== Photographs ==== | ==== Photographs ==== | ||
* [http://www.halld.org/CDC Photographs of the CDC Construction] | * [http://www.halld.org/CDC Photographs of the CDC Construction] | ||
+ | |||
=== [[CDC_Prototype_Studies| Prototype Studies ]] === | === [[CDC_Prototype_Studies| Prototype Studies ]] === |
Latest revision as of 17:04, 24 February 2017
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
- CDC Shipping List Delivery documentation accompanying the CDC
Fabrication Documentation
- Assembly documents
- Final
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)
- End plate Alignment
- Straw Preparation (clean & trim)
- Glueing Donuts into Straws
- Straw Insertion
- Outer Shell Installation
- Wire Stringing Details
- Summary of Tests
- Document describing the measurement of wire tensions
- Preliminary
- Final
- QA Documents
Production Documents
- Conducting Epoxy Order Schedule
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)