CDC Construction
From GlueXWiki
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
Fabrication Documentation
- Assembly documents
- Final
- Final CDC Drawings (old directory, viewable from JLab only)
- Final CDC Drawings (new directory for the later stages of construction)
- End plate Alignment
- add final straw assembly
- Straw Insertion
- add final outer hub and gas lines and shell installation
- Wire Stringing Details
- Summary of Tests
- Document describing the measurement of wire tensions
- Preliminary
- Final
- QA Documents