CDC Construction
From GlueXWiki
Revision as of 17:04, 24 February 2017 by Marki (Talk | contribs) (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
- CDC Shipping List Delivery documentation accompanying the CDC
Fabrication Documentation
- Assembly documents
- Final
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)
- End plate Alignment
- Straw Preparation (clean & trim)
- Glueing Donuts into Straws
- Straw Insertion
- Outer Shell Installation
- Wire Stringing Details
- Summary of Tests
- Document describing the measurement of wire tensions
- Preliminary
- Final
- QA Documents
Production Documents
- Conducting Epoxy Order Schedule
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)