Difference between revisions of "CDC Fabrication Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Documents)
(Documents)
Line 17: Line 17:
 
This section has been expanded and organized in a more readable format on the GlueX Wiki.
 
This section has been expanded and organized in a more readable format on the GlueX Wiki.
 
# [[CDC_Construction_Details | CDC Construction Details]].
 
# [[CDC_Construction_Details | CDC Construction Details]].
 
* Supporting documents
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 CMU Contract Submission]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 SOW]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1438 Technical Review  report]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1619 Quality Assurance Plan]
 
* Assembly documents
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1280 CDC Construction Plan]
 
** [http://www.jlab.org/~vgr/CDC%20Design%202010/  Final CDC Drawings]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1451 End plate Alignment]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1440 Straw Assembly and Insertion]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1624 Straw cut and clean]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1622 Mixing Conducting Epoxy]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1623 Glue Donuts into straws]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1625 Install straws in frame]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1441 Wire String Details]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1537 Conducting Epoxy Order Schedule]
 
** [[Media:tension_measurement.pdf | Document describing the measurement]] of wire tensions.
 
* Q&A Documents
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1442 Summary of Tests]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1532 Straw-tube acceptance checks]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1533 Aluminum Donut acceptance checks]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1534 Aluminum Feedthru acceptance checks]
 
* Traveler Spreadsheets
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1616 Glue Log]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1617 Wire Stringing Log]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1618 Electrical Hookup Log]
 
* Other Log Files
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1620 Cleanroom Log Sheet]
 
* Photographs
 
** [[CMU_CLEAN_ROOM | Clean Room]]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1557 Corrosion on the aluminum endplate.]
 
  
 
= Itineraries =
 
= Itineraries =

Revision as of 16:11, 14 October 2010

CDC Fabrication Readiness Review

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Venue

Topics/Issues that need discussion/resolution

  1. CDC Readiness Checklist

Documents

This section has been expanded and organized in a more readable format on the GlueX Wiki.

  1. CDC Construction Details.

Itineraries

Tentative Agenda

Thursday October 21

  • Arrival Pittsburgh
    • Flights:
    1. Date From/To Flight/Vendor Depart/Arrive
    2. 10/21/2010 PHF-CLT US 2545 07:00 AM/08:13 AM
    3. 10/21/2010 CLT-PIT US 996 09:50 AM/11:16 AM
    4. 10/21/2010 PIT-PHL US 96 08:45 PM/09:57 PM
    5. 10/21/2010 PHL-PHF US 3578 10:55 PM/11:50 PM
  • 12:30 Arrival CMU
  • 13:00 Project Overview
  1. Scope of contract and current review
  2. Status of construction
  • 13:30 Technical Documents Review
  1. Final Construction Plan
  2. Quality Assurance Plans and Acceptance Test Plans
  3. Testing procedures
  4. Documentations and Travelers
  5. Personnel training
  6. Schedule and Tracking
  • 15:30 Coffee
  • 16:00 Financial, Billing and Reporting
  1. ....
  • 17:00 Tour of Facilities
  • 18:00 Closeout
  • 18:30 Adjourn
  • 18:45 Departure to Airport

CDC Construction