Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Issues for the Readiness Review)
(Issues for the Readiness Review)
Line 10: Line 10:
 
## [https://userweb.jlab.org/~ilarin/cpp/tof_note3/rates.pdf CPP Test and TOF Rates] (Ilya)
 
## [https://userweb.jlab.org/~ilarin/cpp/tof_note3/rates.pdf CPP Test and TOF Rates] (Ilya)
 
# Running CPP and NPP together
 
# Running CPP and NPP together
 +
 +
== Trigger ==
 +
Discussion topics with Sasha
 +
# CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
 +
# Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
 +
# We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
  
 
== Documentation for Review ==
 
== Documentation for Review ==

Revision as of 18:10, 19 November 2020

Preparations for the CPP and NPP Readiness Review

Issues for the Readiness Review

  1. Budget
  2. Mechanical Design and Installation
    1. CPP Design Meetings
  3. Trigger
    1. CPP Test and TOF Rates (Ilya)
  4. Running CPP and NPP together

Trigger

Discussion topics with Sasha

  1. CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
  2. Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
  3. We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger

Documentation for Review