Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
Line 2: | Line 2: | ||
* Goal: Complete Readiness Review in time to schedule experiment in 2022 | * Goal: Complete Readiness Review in time to schedule experiment in 2022 | ||
* [[Media:Coarse Acc Schedule 2021.pdf]] | * [[Media:Coarse Acc Schedule 2021.pdf]] | ||
+ | |||
+ | == Draft Agenda == | ||
+ | |||
+ | * Overview of experiment and setup | ||
+ | * Engineering design and installation of the platform and muon chambers | ||
+ | * Project implementation, resources and schedule | ||
+ | |||
== Issues for the Readiness Review == | == Issues for the Readiness Review == |
Revision as of 16:21, 3 December 2020
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Draft Agenda
- Overview of experiment and setup
- Engineering design and installation of the platform and muon chambers
- Project implementation, resources and schedule
Issues for the Readiness Review
- Budget
- Mechanical Design and Installation
- Trigger
- CPP Test and TOF Rates (Ilya)
- Running CPP and NPP together
Trigger
Discussion topics with Sasha
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020