== Draft Response to Charge ==
 
 
# What are the running conditions for the experiments? Please state clearly the target, detectors, beamline configurations and operation as well as the integration of the Muon Detector (for E12-13-008) in Hall D. Has the detectors ownership, maintenance and control during beam operations been defined?
 
# What is the status/performance requirements of the new installations required for these experiments? Specifically:
 
#* The Multi-wire proportional chambers
 
#* The downstream platform, support structure and iron absorbers
 
#* The Pb target
 
#* The new trigger configuration (for E12-13-008)
 
# If not completed, what are the completion/commissioning schedules, tasks and user commitment?
 
# Are there any potential non-standard hazards or tasks, for example is there any temporary structure needed for the experiments that require access?
 
# What are the expected data rates for the experiments (both physics data rate and background rates)?
 
# Are the responsibilities for carrying out each job identified, and are the manpower and other resources necessary to complete them on time in place?
 
# Are the beam commissioning procedures and machine protection systems sufficiently defined for this stage?
 
# What is the simulation and data analysis software status for the experiment? Has readiness for expedient analysis of the data been demonstrated? What is the projected timeline for the first publication?
 
# What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments?
 
  
 
== Additions to Standard Equipment ==
 
== Additions to Standard Equipment ==

Revision as of 11:39, 13 January 2021

Preparations for the CPP and NPP Readiness Review

Draft Outline Presentations (Date?)

  • Reviewers
  • Agenda ***DRAFT***
    • 08:30-90:00 Executive session
    • 08:45-09:30 Overview of experiment and setup -- Rory Miskimen ?
    • 09:30-10:15 Engineering design and installation of the platform and muon chambers -- Tim Whitlatch ?
    • 10:15-10:45 Coffee break
    • 10:45-11:45 Project implementation, resources and schedule -- Elton Smith ?
    • 11:45-14:30 Lunch + Executive session
    • 14:30 Closeout
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors

Platform Design

Trigger Discussion

Discussion topics with Sasha and Hai

  1. CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
  2. Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
  3. We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger

References:

Documentation for Review

  1. CPP Jeopardy Presentation PAC 48 September 24, 2020
  2. CPP Jeopardy Update PAC 48 June 22, 2020
  3. OSP for muon chambers
    • Receipt and checks at JLab
    • Electronics from CDC
    • Gas system from CDC
    • Signal cables
  4. Drawings for support structure and iron absorbers
  5. Procedures for installation of muon detector
  6. Description of TOF trigger