Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Draft Response to Charge)
(Comments to Response 3 (Approval))
 
(90 intermediate revisions by 4 users not shown)
Line 3: Line 3:
 
* [[Media:Coarse Acc Schedule 2021.pdf]]
 
* [[Media:Coarse Acc Schedule 2021.pdf]]
  
== Draft Outline Presentations (Date?) ==
+
== Planning for Experiment ==
 +
* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 +
 
 +
== Outline Presentations (February 10, 2021) ==
  
 
* [[Media:HallD CPP-NPP charge.pdf | Charge]]
 
* [[Media:HallD CPP-NPP charge.pdf | Charge]]
  
*; Reviewers:
+
* [https://bluejeans.com/195964581  https://bluejeans.com/195964581] Bluejeans connection for Open Session
*:  
+
  
* Agenda ***DRAFT***
+
* Reviewers:
** 08:30-90:00 Executive session
+
** Stepan Stepanyan (chair+muon detector)
** 08:45-09:30 Overview of experiment and setup -- Rory Miskimen ?
+
** Alexandre Cansonne (Trigger)
** 09:30-10:15 Engineering design and installation of the platform and muon chambers --  Tim Whitlatch ?
+
** Brad Sawatzky (Tracking System -MWPC)
** 10:15-10:45 Coffee break
+
** Chris Keith (Target)
** 10:45-11:45 Project implementation, resources and schedule -- Elton Smith ?
+
** Robin Wines (Installation)
** 11:45-14:30 Lunch + Executive session
+
** Mikhail Kostin (RadCon)
 +
** Edy Nissen (Beamline)
 +
** Javier Gomez (Observer)
 +
** Ed Folts (Observer)
 +
 
 +
* Agenda
 +
** 08:15-08:45 Executive session
 +
** 08:45-09:35 (30+20) [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4905 Overview of Experiment and Setup] (Charges: 1, 2. 5, 8) -- Rory Miskimen  
 +
** 09:35-10:25 (30+20) [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4903 Engineering Design, Fabrication, Operation and Installation of CPP Hardware] (Charges: 2, 3, 4) --  Tim Whitlatch  
 +
** 10:25-10:45 Coffee break
 +
** 10:45-11:15 (20+10) [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4898 Project implementation, resources and schedule] (Charges: 3, 6, 7, 9) -- Elton Smith
 +
** 11:15-14:30       Lunch and Executive Session
 
** 14:30                 Closeout  
 
** 14:30                 Closeout  
  
* ERR Final Report
+
== Report and Response==
* Addressing ERR Review Recommendations
+
  
== Draft Response to Charge ==
+
=== Report ===
 +
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4969 ERR Final Report, Feb 23, 2021]
  
# What are the running conditions for the experiments? Please state clearly the target, detectors, beamline configurations and operation as well as the integration of the Muon Detector (for E12-13-008) in Hall D. Has the detectors ownership, maintenance and control during beam operations been defined?
+
=== Response 1 ===
# What is the status/performance requirements of the new installations required for these experiments? Specifically:
+
* [https://halldweb.jlab.org/DocDB/0050/005079/002/HallD_CPP_NPP_ERR_v4_response.pdf Point-by-point Response]
#* The Multi-wire proportional chambers
+
* [https://halldweb.jlab.org/DocDB/0050/005079/002/Coarse_schedule.pdf Timelines and Responsibilities]
#* The downstream platform, support structure and iron absorbers
+
* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=5080 Fabrication and Performance of the MWPC] GlueX-doc-5080
#* The Pb target
+
 
#* The new trigger configuration (for E12-13-008)
+
=== Comments to Response 1 ===
# If not completed, what are the completion/commissioning schedules, tasks and user commitment?
+
* [[Media:ERR Comments1.png | ERR Committee comments to response 1]]
# Are there any potential non-standard hazards or tasks, for example is there any temporary structure needed for the experiments that require access?
+
 
# What are the expected data rates for the experiments (both physics data rate and background rates)?
+
=== Response 2 ===
# Are the responsibilities for carrying out each job identified, and are the manpower and other resources necessary to complete them on time in place?
+
# MWPC Efficiency
# Are the beam commissioning procedures and machine protection systems sufficiently defined for this stage?
+
#* [https://halldweb.jlab.org/DocDB/0050/005079/003/HallD_CPP_NPP_ERR_response2.pdf Response to parts A, B and C]
# What is the simulation and data analysis software status for the experiment? Has readiness for expedient analysis of the data been demonstrated? What is the projected timeline for the first publication?
+
# Schedule Status
# What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments?
+
#* [[Media:CPP-NPP schedule status2.png | CPP-NPP Schedule Status 5/11/2021]]. The following two references show that the new hdgeant4 simulation is operational and working:
 +
#* [https://logbooks.jlab.org/entry/3876633 Log Entry 3876633] Histogram of muon hits from hdgeant4 simulation.
 +
#* [[Tracking / extrapolation to MWPCs]] Preliminary studies of extrapolation of FDC tracks to MWPCs
 +
 
 +
=== Comments to Response 2 ===
 +
* [[Media:ERR Comments2.png | ERR Committee comments to response 2]]
 +
 
 +
=== Response 3 ===
 +
We have summarized the preliminary results from the cosmic-ray test in EEL126 in [https://halldweb.jlab.org/DocDB/0053/005373/002/MWPC_production_testing.pdf '''Production Testing of MWPCs for CPP''' (GlueX-doc-5373)]. The CPP experiment requires six MWPCs and we have six chambers that deliver excellent performance in the cosmic-ray setup in the EEL. The estimates of the efficiency are of the order of 99.7% or greater over a broad range of voltage and/or software thresholds. Two spare MWPCs (Frodo and Galadriel) exhibit low levels of electronic noise that is under investigation.
 +
<!--
 +
#* [https://logbooks.jlab.org/entry/3940051 Efficiency summary for Arwen and Denethor (retest)]
 +
#* [https://logbooks.jlab.org/entry/3932878 Efficiency summaries for all chambers]
 +
#* [https://logbooks.jlab.org/entry/3937367 Arwen R188 analysis and voltage scan]
 +
#* [https://logbooks.jlab.org/entry/3929607 Bilbo R166 and Celeborn R169 analysis]
 +
#* [https://logbooks.jlab.org/entry/3936817 Denethor analysis R184]
 +
#* [https://logbooks.jlab.org/entry/3932758 Eowyn analysis R171]
 +
#* [https://logbooks.jlab.org/entry/3932293 Frodo analysis R175]
 +
#* [https://logbooks.jlab.org/entry/3922895 Galadriel analysis R157]
 +
#* [https://logbooks.jlab.org/entry/3922927 Haldor analysis R159]
 +
-->
 +
 
 +
=== Comments to Response 3 (Approval) ===
 +
 
 +
* [[Media:ERR Approval.png | Email from Patrizia]]: The main points are summarized in the next two points.
 +
* "...the committee is satisfied with the results of the MWPC tests and therefore they think the CPP/NPP collaboration fulfilled the requirements to pass the ERR."
 +
* The committee encourages us to measure the performance in Hall D: "...the noise level can be different in the hall and therefore the threshold settings that will affect the efficiency. A test of chambers in the hall before the run is advised."
  
 
== Additions to Standard Equipment ==
 
== Additions to Standard Equipment ==
Line 46: Line 84:
 
* New (mono-isotopic) solid Pb target
 
* New (mono-isotopic) solid Pb target
 
* Charged-particle trigger based on the time-of-flight detectors
 
* Charged-particle trigger based on the time-of-flight detectors
 
+
* Move tagger microscope to cover 6 GeV coherent peak
== Platform Design ==
+
 
+
* [[CPP Design Meetings]]
+
 
+
== Trigger Discussion ==
+
Discussion topics with Sasha and Hai
+
# CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
+
# Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
+
# We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
+
 
+
References:
+
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding]
+
* [[TOF clusters]]
+
  
 
== Documentation for Review ==
 
== Documentation for Review ==
  
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4670 CPP Jeopardy Presentation PAC 48] September 24, 2020
+
# PAC Documents
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4670 CPP Jeopardy Presentation PAC 48] September 24, 2020
# OSP for muon chambers
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
#* Receipt and checks at JLab
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4600 NPP Presentation to PAC 48] August 13, 2020
#* Electronics from CDC
+
# TOF Trigger
#* Gas system from CDC
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding]
#* Signal cables
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4889 TOF trigger pattern for CPP experiment]
# Drawings for support structure and iron absorbers
+
# Draft Documents
# Procedures for installation of muon detector
+
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/3210T1Form_THA_CPP.doc THA MWPC]
# Description of TOF trigger
+
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/3210T1Form_THA_FCAL_Dark_Room.doc THA FCAL Dark Room]
 +
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/3310T1Form_OSP_CPP.doc OSP for MWPC]
 +
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/COO.pdf COO]
 +
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ERG.pdf ERG]
 +
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD.pdf ESAD], [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD_mod.pdf ESAD version with muon detector]
 +
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Draft_HallD_RSAD.pdf RSAD]
 +
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/D00000-01-06-P006_RevB.docx FCAL Dark Room Procedure]
 +
# [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Released_drawings Released Drawings]
 +
# [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Released_drawings/HallD_CPP_Schedule.pdf Installation Schedule]
 +
# Wiki Pages for further reference
 +
#* [[Charged Pion Polarizability Experiment in Hall-D | CPP wiki page]]
 +
#* [[Pi0 Polarizability | NPP wiki page]]

Latest revision as of 08:56, 16 December 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Outline Presentations (February 10, 2021)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)

Report and Response

Report

Response 1

Comments to Response 1

Response 2

  1. MWPC Efficiency
  2. Schedule Status

Comments to Response 2

Response 3

We have summarized the preliminary results from the cosmic-ray test in EEL126 in Production Testing of MWPCs for CPP (GlueX-doc-5373). The CPP experiment requires six MWPCs and we have six chambers that deliver excellent performance in the cosmic-ray setup in the EEL. The estimates of the efficiency are of the order of 99.7% or greater over a broad range of voltage and/or software thresholds. Two spare MWPCs (Frodo and Galadriel) exhibit low levels of electronic noise that is under investigation.

Comments to Response 3 (Approval)

  • Email from Patrizia: The main points are summarized in the next two points.
  • "...the committee is satisfied with the results of the MWPC tests and therefore they think the CPP/NPP collaboration fulfilled the requirements to pass the ERR."
  • The committee encourages us to measure the performance in Hall D: "...the noise level can be different in the hall and therefore the threshold settings that will affect the efficiency. A test of chambers in the hall before the run is advised."

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference