Line 37: | Line 37: | ||
# We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger | # We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger | ||
+ | References: | ||
+ | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding] (Ilya) | ||
* [[TOF clusters]] | * [[TOF clusters]] | ||
Revision as of 16:31, 3 December 2020
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Draft Outline Presentations (Date?)
- Reviewers
- Agenda ***DRAFT***
- 08:30-90:00 Executive session
- 08:45-09:30 Overview of experiment and setup -- Rory Miskimen ?
- 09:30-10:15 Engineering design and installation of the platform and muon chambers -- Tim Whitlatch ?
- 10:15-10:45 Coffee break
- 10:45-11:45 Project implementation, resources and schedule -- Elton Smith ?
- 11:45-14:30 Lunch + Executive session
- 14:30 Closeout
- ERR Final Report
- Addressing ERR Review Recommendations
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
Trigger Discussion
Discussion topics with Sasha
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
References:
- TOF trigger rate study with the upgraded TOF detector and optional lead shielding (Ilya)
- TOF clusters
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020