Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
(→Documentation for Review) |
(→Documentation for Review) |
||
Line 50: | Line 50: | ||
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020 | # [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020 | ||
# OSP for muon chambers | # OSP for muon chambers | ||
+ | #* Receipt and checks at JLab | ||
+ | #* Electronics from CDC | ||
+ | #* Gas system from CDC | ||
+ | #* Signal cables | ||
# Drawings for support structure and iron absorbers | # Drawings for support structure and iron absorbers | ||
# Procedures for installation of muon detector | # Procedures for installation of muon detector | ||
# Description of TOF trigger | # Description of TOF trigger |
Revision as of 16:44, 3 December 2020
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Draft Outline Presentations (Date?)
- Charge
- Reviewers
- Agenda ***DRAFT***
- 08:30-90:00 Executive session
- 08:45-09:30 Overview of experiment and setup -- Rory Miskimen ?
- 09:30-10:15 Engineering design and installation of the platform and muon chambers -- Tim Whitlatch ?
- 10:15-10:45 Coffee break
- 10:45-11:45 Project implementation, resources and schedule -- Elton Smith ?
- 11:45-14:30 Lunch + Executive session
- 14:30 Closeout
- ERR Final Report
- Addressing ERR Review Recommendations
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
Platform Design
Trigger Discussion
Discussion topics with Sasha
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
References:
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- OSP for muon chambers
- Receipt and checks at JLab
- Electronics from CDC
- Gas system from CDC
- Signal cables
- Drawings for support structure and iron absorbers
- Procedures for installation of muon detector
- Description of TOF trigger