CPP and NPP Readiness Review

From GlueXWiki
Revision as of 16:21, 3 December 2020 by Elton (Talk | contribs)

Jump to: navigation, search

Preparations for the CPP and NPP Readiness Review

Draft Agenda

  • Overview of experiment and setup
  • Engineering design and installation of the platform and muon chambers
  • Project implementation, resources and schedule


Issues for the Readiness Review

  1. Budget
  2. Mechanical Design and Installation
    1. CPP Design Meetings
  3. Trigger
    1. CPP Test and TOF Rates (Ilya)
  4. Running CPP and NPP together

Trigger

Discussion topics with Sasha

  1. CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
  2. Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
  3. We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger

Documentation for Review

  1. CPP Jeopardy Presentation PAC 48 September 24, 2020
  2. CPP Jeopardy Update PAC 48 June 22, 2020