Difference between revisions of "Calorimeter Review"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
 
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=972 Talk 7] 3:00 pm Tim
 
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=972 Talk 7] 3:00 pm Tim
 
## Friday F326/327 Feb 8
 
## Friday F326/327 Feb 8
##* Talk 4 10:00 am Beni
+
##* [http://dustbunny.physics.indiana.edu/~bzihlman/fcal_calo_review.pdf Talk 4] 10:00 am Beni
 
# Second round of dry runs (week of 11th of February) TENTATIVE
 
# Second round of dry runs (week of 11th of February) TENTATIVE
 
## Monday F326/327 Feb 11  
 
## Monday F326/327 Feb 11  
Line 27: Line 27:
 
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=972 Talk 7]  3:00 pm Tim
 
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=972 Talk 7]  3:00 pm Tim
 
## Friday F326/327 Feb 15
 
## Friday F326/327 Feb 15
##* [http://dustbunny.physics.indiana.edu/~bzihlman/fcal_calo_review.pdf Talk 4] 10:00 am Beni
+
##* 8:00 am Beni
 
##* Talk 5 10:00 am Matt
 
##* Talk 5 10:00 am Matt
 
# Pre-brief Material. Due Feb 11 to reviewers.
 
# Pre-brief Material. Due Feb 11 to reviewers.

Revision as of 13:04, 8 February 2008

Preparations for the Hall D Calorimeter Final Design and Safety Review

  1. Review Documents
  2. First round of dry runs (week of 4th of February)
    1. Monday L207 Feb 4
    2. Wednesday F326/327 Feb 6
    3. Thursday F326/327 Feb 7
    4. Friday F326/327 Feb 8
  3. Second round of dry runs (week of 11th of February) TENTATIVE
    1. Monday F326/327 Feb 11
    2. Tuesday F326/327 Feb 12
      • Talk 5 4:00 pm Matt
    3. Wednesday F326/327 Feb 13
    4. Thursday F326/327 Feb 14
    5. Friday F326/327 Feb 15
      • 8:00 am Beni
      • Talk 5 10:00 am Matt
  4. Pre-brief Material. Due Feb 11 to reviewers.
  5. Final talks to Elke: 17th of February.
  6. Review: Feb 19 and 20.
  7. issues that need special attention