Calorimeter Review
From GlueXWiki
Contents
The Hall D Calorimeter Final Design and Safety Review
Material Prepared for the Review
- Prebrief material for the review.
- GlueX-doc-985 Physics and Calorimeter Performance Metrics
- GlueX-doc-986 BCAL: Barrel Calorimeter]
- GlueX-doc-987 SiPM for BCAL
- GlueX-doc-988 FCAL: Forward Calorimeter
- GlueX-doc-989 Calorimeter Simulations
- Final versions of talks.
- Committee Charge
- Overview
- GlueX-doc-968 BCAL: Presentation
- Silicon PM
- GlueX-doc-983 FCAL: Presentation
- GlueX-doc-984 Calorimeter Simulation
- Electronics
- Mechanical
Relevant Wiki Pages
- Description BCAL
- Description FCAL
- Description Electronics
- Description Calibration-Monitoring
- Safety/QA documentation ESH&Q
Dry Run Schedule for the Review
- First round of dry runs (week of 4th of February)
- Second round of dry runs (week of 11th of February) TENTATIVE
- Pre-brief Material. Due Feb 11 to reviewers.
- Calorimeter Document
- Drawings
- Other?
- Final talks to Elke: 17th of February.
- Review: Feb 19 and 20.
- issues that need special attention