Cart Operation Plan
From GlueXWiki
Cart Operation Plan
DRAFT
- People authorized to perform the following procedures.
- Eric Scott
- Moving the cart from one position to another (Alcove / Platform)
- Cart in the platform position
- Cart must have motion lock enables and outriggers tightened before use.
- Moving the carriage
- Must have at least 3 people on the platform to move the carriage.
- Positioning outrigger
- Cart in alcove position
- Checking for clearance through angular travel
- Moving carriage
- Enabling cart for remote control
- Operating cart under remote control
DRAFT