Cart Operation Plan

From GlueXWiki
Revision as of 12:17, 20 July 2006 by Eric (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Cart Operation Plan

DRAFT

  • People authorized to perform the following procedures.
Eric Scott

  • Moving the cart from one position to another (Alcove / Platform)
  • Cart in the platform position
  • Cart must have motion lock enables and outriggers tightened before use.
  • Moving the carriage
  1. Must have at least 3 people on the platform to move the carriage.
  2. Positioning outrigger
  • Cart in alcove position
  • Checking for clearance through angular travel
  • Moving carriage
  • Enabling cart for remote control
  • Operating cart under remote control

DRAFT