Difference between revisions of "Dec 17, 2009 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda: Internal Review of SiPM Option)
(Tentative Agenda: Internal Review of SiPM Option)
Line 39: Line 39:
 
## Geometry model
 
## Geometry model
 
# Discussion - path forward
 
# Discussion - path forward
## [[Media: | Schedule]]
+
## [[Media:Bcal readout baseline Dec09.pdf | Baseline Schedule]]
 
# Discussion - MOU with USM
 
# Discussion - MOU with USM
  
 
= Minutes =
 
= Minutes =

Revision as of 11:35, 17 December 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Order prototype light guides (Elton)
  2. Determine the amplitude vs Npe for the light sensors (Carl)
  3. Testing of new modules to determine the range of phoelectrons expected.

Documents to Review

  1. Plan for SiPM Testing (Carl and Fernando)


Tentative Agenda: Internal Review of SiPM Option

  1. Announcements
  2. Review of Action Items
  3. Overview (Elton)
    1. Segmentation for all SiPM option Number of SiPMs = (24+16)*2*48 = 3840
  4. SiPM - update
    1. Electrical Tests (Fernando)
    2. PDE/Dark Rate (Carl)
    3. Acceleration Tests (Carl)
    4. Tests still planned
  5. Detailing the SiPM option
    1. Light collection and dynamic range (number of photons expected per sensor)
    2. Cooling / temperature stabilization (specifications)
    3. Output (gain and PDE) stabilization and summing
    4. Geometry model
  6. Discussion - path forward
    1. Baseline Schedule
  7. Discussion - MOU with USM