Difference between revisions of "Dec 2, 2008 BCAL Construction"
From GlueXWiki
(→Documents to Review) |
(→Teleconference Instructions) |
||
Line 1: | Line 1: | ||
= Teleconference Instructions = | = Teleconference Instructions = | ||
+ | Persons onsite at JLab meet in CC F228 | ||
+ | |||
* +1-800-377-8846 : US | * +1-800-377-8846 : US | ||
* +1-888-276-7715 : Canada | * +1-888-276-7715 : Canada |
Revision as of 10:02, 1 December 2008
Contents
Teleconference Instructions
Persons onsite at JLab meet in CC F228
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Items for followup from Oct 15 meeting
- See Wiki page Oct 15, 2008 Calorimetry
- Construction Manager
- Progress at UofA on job description, job ad
- Co-Op job ads
Documents to Review
- Dan's questions: Media:BCAL_questions.doc
Tentative Agenda
- Announcements
- Base Plate
- Discuss hole/pocket locations, sizes and tolerances
- Are drawings final? If yes, expedite prototype base plate construction
- O-ring location
- Top Plate
- Have it thicker than 8mm and machine it down for leveling?
- Features machined after previous step (holes then are not through)
- How are the tracking packages mounted inside BCAL (Tim, brief description)
- Drawings
- Overall Tolerances, conflicts, stacking of systematic building errors
- Danny's/Kevin's questions
- Kevin's plans at Ross for 7.5o fixture
- Assignment of machining tasks (UofA, Ross Machine Shop)
- Other business
- Use DocDB (has version capability) for Drawings uploads; PDF for sure, maybe other formats (engineering, 3D renderings)?