Difference between revisions of "Dec 6, 2019 Engineering Group Meeting"
From GlueXWiki
(Created page with "== Meeting Time and Place == Friday Dec 6, 2019 at 2pm At Jefferson Lab, room TED 2504 == Agenda == * ESH&Q minute - ** Safety Workers group ** New rules for working on...") |
(→Agenda) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
== Agenda == | == Agenda == | ||
* ESH&Q minute - | * ESH&Q minute - | ||
− | ** | + | ** Workers Safety Committee - Keith |
** New rules for working on Electrical equipment | ** New rules for working on Electrical equipment | ||
+ | *** Checklist Required (Class and Mode) | ||
+ | *** Log entry or HDLisT required | ||
+ | |||
* Training | * Training | ||
** Property | ** Property | ||
− | ** | + | ** General Access |
− | * Budget - | + | * Budget - Continuing resolution 90% of last years monthly charges |
− | + | * Accelerator Status - Run through Dec 19, 6am, start up Jan 10, 2020- May 2020, down until Jan 2021 | |
− | * Accelerator Status - | + | ** [[Media:Accel_schedule.pdf]] |
− | * What needs to be done in the meantime? [[Media: | + | ** 2021 and 2022, run Jan - Sept straight |
+ | * What needs to be done in the meantime? | ||
+ | ** Dec 9-13 Move GEM 2 more times (Solenoid at 1350A) | ||
+ | ** Dec 10 Install BR Crystal testing station and check out PS magnet | ||
+ | ** Dec 18 Ramp down Solenoid? and Separate FCAL platform and Install Halo Shield on TOF | ||
+ | ** Dec 19 Remove GEM from DIRC Platform and install BL DS of PS | ||
+ | ** Dec 20 Prepare Hall for vacation | ||
+ | ** Jan 7-10 Couple FCAL platform and prepare Hall for beam (some subset of HCO TBD) | ||
+ | ** Continue FCAL Insert Design (Keith H) | ||
+ | ** Start CPP Design [[Media:CPP_Concept.pdf]] | ||
* Hot Check Out https://accweb.acc.jlab.org/hco/checklists | * Hot Check Out https://accweb.acc.jlab.org/hco/checklists | ||
* Hall D operations https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts | * Hall D operations https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts | ||
* Hall D Maintenance Log https://halldweb.jlab.org/cgi-bin/maintenance/cgi/status.pl | * Hall D Maintenance Log https://halldweb.jlab.org/cgi-bin/maintenance/cgi/status.pl | ||
− | * | + | * EPICS screens https://epicsweb.jlab.org/ |
− | + | ||
− | + | == Offsite Meeting == | |
− | + |
Latest revision as of 14:53, 6 December 2019
Meeting Time and Place
Friday Dec 6, 2019 at 2pm At Jefferson Lab, room TED 2504
Agenda
- ESH&Q minute -
- Workers Safety Committee - Keith
- New rules for working on Electrical equipment
- Checklist Required (Class and Mode)
- Log entry or HDLisT required
- Training
- Property
- General Access
- Budget - Continuing resolution 90% of last years monthly charges
- Accelerator Status - Run through Dec 19, 6am, start up Jan 10, 2020- May 2020, down until Jan 2021
- Media:Accel_schedule.pdf
- 2021 and 2022, run Jan - Sept straight
- What needs to be done in the meantime?
- Dec 9-13 Move GEM 2 more times (Solenoid at 1350A)
- Dec 10 Install BR Crystal testing station and check out PS magnet
- Dec 18 Ramp down Solenoid? and Separate FCAL platform and Install Halo Shield on TOF
- Dec 19 Remove GEM from DIRC Platform and install BL DS of PS
- Dec 20 Prepare Hall for vacation
- Jan 7-10 Couple FCAL platform and prepare Hall for beam (some subset of HCO TBD)
- Continue FCAL Insert Design (Keith H)
- Start CPP Design Media:CPP_Concept.pdf
- Hot Check Out https://accweb.acc.jlab.org/hco/checklists
- Hall D operations https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts
- Hall D Maintenance Log https://halldweb.jlab.org/cgi-bin/maintenance/cgi/status.pl
- EPICS screens https://epicsweb.jlab.org/