* Accelerator Status - Run through Dec 19, 6am, start up Jan 10, 2020- May 2020, down until Jan 2021
 
* Accelerator Status - Run through Dec 19, 6am, start up Jan 10, 2020- May 2020, down until Jan 2021
 
** [[Media:Accel_schedule.pdf]]
 
** [[Media:Accel_schedule.pdf]]
* What needs to be done in the meantime? [[Media:Summer_tasks_2017.pdf]]\
+
** 2021 and 2022, run Jan - Sept straight
 +
* What needs to be done in the meantime?  
 +
** Dec 9-13  Move GEM 2 more times (Solenoid at 1350A)
 +
** Dec 10  Install BR Crystal testing station and check out PS magnet
 +
** Dec 18  Ramp down Solenoid? and Separate FCAL platform and Install Halo Shield on TOF
 +
** Dec 19  Remove GEM from DIRC Platform and install BL DS of PS
 +
** Dec 20  Prepare Hall for vacation
 +
** Jan 7-10 Couple FCAL platform and prepare Hall for beam (some subset of HCO TBD)
 +
** Continue FCAL Insert Design (Keith H)
 +
** Start CPP Design  [[Media:Accel_schedule.pdf]]
 
* Hot Check Out https://accweb.acc.jlab.org/hco/checklists
 
* Hot Check Out https://accweb.acc.jlab.org/hco/checklists
 
* Hall D operations  https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts
 
* Hall D operations  https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts

Revision as of 14:14, 6 December 2019

Meeting Time and Place

Friday Dec 6, 2019 at 2pm At Jefferson Lab, room TED 2504


Agenda

  • ESH&Q minute -
    • Workers Safety Committee - Keith
    • New rules for working on Electrical equipment
      • Checklist Required (Class and Mode)
      • Log entry or HDLisT required