Difference between revisions of "Dec 9, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Items for followup from previous meeting(s))
Line 15: Line 15:
 
# Monitoring
 
# Monitoring
 
#* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina)
 
#* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina)
#* IU will provide mechanical drawings to Athens to help design attachment and connection points.
+
#* <strike>IU will provide mechanical drawings to Athens to help design attachment and connection points.</strike>
 
#* IU: checking cross talk of calibration inputs across modules.  
 
#* IU: checking cross talk of calibration inputs across modules.  
 
# Fcal construction
 
# Fcal construction

Revision as of 11:38, 9 December 2010

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.


Items for followup from previous meeting(s)

  1. Monitoring
    • Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
    • IU will provide mechanical drawings to Athens to help design attachment and connection points.
    • IU: checking cross talk of calibration inputs across modules.
  2. Fcal construction
    • Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
    • Lubomir to provide references on radiation damage of lead glass.
    • JLab decide on disposition of Fcal cables to free up space at IU. Ship all cables back to JLab for disposition.
  3. SiPMs
    • IU: simulation using geometry for summed units

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
    1. Requirements for BCAL monitoring: summary points and Monitoring System Requirements (Christina, Elton and Zisis)
  4. FCAL
    1. Construction Status
  5. BCAL
    1. Construction Status
    2. Readout segmentation
  6. Simulations
  7. Other Updates

Minutes