Difference between revisions of "December 18, 2015 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 20: Line 20:
 
# [https://gluexdirc.mit.edu/dirc/methods-attach-pmts PMT coupling] (Maria)
 
# [https://gluexdirc.mit.edu/dirc/methods-attach-pmts PMT coupling] (Maria)
 
# Box length and support structure plans (All)
 
# Box length and support structure plans (All)
# Mirror tests at JLab (John/Justin)
+
# Mirror tests at JLab (John/Justin) [[https://halldweb1.jlab.org/wiki/index.php/File:MirrorMeasurementMeeting121715.pdf Slides]]
 
# [[Task list from DIRC project review (October 14, 2015)|Task list]]
 
# [[Task list from DIRC project review (October 14, 2015)|Task list]]
 
# AOB
 
# AOB

Revision as of 00:04, 18 December 2015

Meeting Information

GlueX PID Upgrade Meeting
Friday, December 18, 2015
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. PMT coupling (Maria)
  3. Box length and support structure plans (All)
  4. Mirror tests at JLab (John/Justin) [Slides]
  5. Task list
  6. AOB