Difference between revisions of "FCAL Installation"

From GlueXWiki
Jump to: navigation, search
 
(5 intermediate revisions by the same user not shown)
Line 27: Line 27:
 
[[Stacking FCAL2 modules]]
 
[[Stacking FCAL2 modules]]
  
 +
:: - [https://halldweb.jlab.org/detectors/fcal2/installation/stacking/fcal_insert_map.xlsx Map of installed ECAL modules]
  
<!-- [[Testing of PbWO dividers]] -->
 
  
 
[[Testing ECAL modules]]
 
[[Testing ECAL modules]]
Line 34: Line 34:
 
[[Testing of PMT dividers]]
 
[[Testing of PMT dividers]]
  
 +
[[Detector Alignment]]
  
 
[[List of tasks and manpower]]
 
[[List of tasks and manpower]]
Line 39: Line 40:
 
[https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
 
[https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
 
:: - [https://halldweb.jlab.org/detectors/fcal2/installation/students_reports_2023 Students reports]
 
:: - [https://halldweb.jlab.org/detectors/fcal2/installation/students_reports_2023 Students reports]
 +
 +
[https://www.flickr.com/photos/jeffersonlab/sets/72177720313495369 Detector Photos]
 +
 
=== Usefull links ===
 
=== Usefull links ===
  

Latest revision as of 16:43, 20 February 2024


Visual inspection of lead glass modules

Repairing of lead glass modules

Lead glass PMT and dividers


Rearranging FCAL cables

FCAL2 Crates

Distribution of signals and voltages

Testing and labeling cables

Removing FCAL cables from the detector


Work space in Hall D


Stacking FCAL2 modules

- Map of installed ECAL modules


Testing ECAL modules

Testing of PMT dividers

Detector Alignment

List of tasks and manpower

Summer Students (2023)

- Students reports

Detector Photos

Usefull links

HyCal in Hall B

Status of the insert fabrication