Difference between revisions of "Feb 14, 2012 Calorimetry"
From GlueXWiki
(→Draft outline) |
(→Draft outline) |
||
Line 53: | Line 53: | ||
#* Fiber Light Transmission Tests | #* Fiber Light Transmission Tests | ||
#* Silicon Photomultiplier Test | #* Silicon Photomultiplier Test | ||
+ | # Upstream Photon Veto | ||
Proposed outline for revised section | Proposed outline for revised section |
Revision as of 12:17, 3 February 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication
- TDR
- Create outline to assign writing homework (Elton)
Draft outline
Existing (old) outline
- Global Design
- Forward Calorimeter
- The E852 Experience
- The RadPhi Experience
- Estimating the GlueX pi0 and eta Mass Resolution
- Electromagnetic Backgrounds
- Radiation Damage
- Heat Curing of Damaged Blocks
- Assessing Lead Glass Blocks and PMT's
- Lead glass block evaluation
- PMT Evaluation
- Other Issues
- Electromagnetic Rates in the LGD
- Magnetic Shielding
- Monitoring
- Calibration
- Triggering
- Barrel Calorimeter
- Design Considerations
- Pb/Sci Barrel Calorimeter
- The GlueX BCAL
- Construction of Prototype Modules
- Production of Lead Sheets
- Module Construction
- Scintillating Fiber Tests
- Fiber Light Transmission Tests
- Silicon Photomultiplier Test
- Upstream Photon Veto
Proposed outline for revised section
- Global Design
- Forward Calorimeter
- The E852 Experience
- The RadPhi Experience
- Estimating the GlueX pi0 and eta Mass Resolution
- Electromagnetic Backgrounds
- Radiation Damage
- Heat Curing of Damaged Blocks
- Assessing Lead Glass Blocks and PMT's
- Lead glass block evaluation
- PMT Evaluation
- Other Issues
- Electromagnetic Rates in the LGD
- Magnetic Shielding
- Monitoring
- Calibration
- Triggering
- Barrel Calorimeter
- Geometry
- Module construction
- Scintillating fibers
- Lead
- Fabrication
- Readout
- SiPMs
- Operation (e.g. temp compensation etc)
- Prototypes and tests
- Calibration and Monitoring
- Expected Performance
Tentative Agenda
- Announcements
- Review of Action Items
- Collaboration Meeting
- Friday at 2:30pm, 4 30 minute talks.
- Monitoring.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Beam tests in Hall B (John)
- BCAL
- USM update
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. The old outline is the following
- Simulations/Reconstruction
- Any other business
Minutes
Attending: