Difference between revisions of "Feb 17, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 8: Line 8:
 
# Update Npe numbers on dynamic range table to include effect of attenuation length (Elton)
 
# Update Npe numbers on dynamic range table to include effect of attenuation length (Elton)
 
# Finalize drawings for defined parts and start ordering mechanical components (Chuck)
 
# Finalize drawings for defined parts and start ordering mechanical components (Chuck)
 +
# FCheck whether  additional electrical tech/design personnel is needed to assist on this project. (Fernando and Jack)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 18:45, 11 February 2011

Action Items from previous meetings

  1. Run his cooling model simulation for the situation when the electronics was turned off (Jim)
  2. Update Npe numbers on dynamic range table to include effect of attenuation length (Elton)
  3. Finalize drawings for defined parts and start ordering mechanical components (Chuck)
  4. FCheck whether additional electrical tech/design personnel is needed to assist on this project. (Fernando and Jack)

Tentative Agenda

  1. Announcements
  2. Schedule, reporting, and manpower (Elton)
  3. First article testing (Carl and Yi)
  4. Mechanical cooling (Jim)
  5. Temperature compensation (Jack)
  6. Preamp-summing (Fernando)
  7. Discussion

Minutes

Attendees: