Feb 24, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 18:05, 17 February 2011 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

References

Action Items from previous meetings

  1. Check current draw of SiPMs during beam conditions (Yi and Carl)
  2. Provide thermistor data sheet to Jim (Jack)
  3. Get cable specs to Jim (Fernando)

Tentative Agenda

  1. Announcements
  2. Schedule, reporting, and manpower (Elton)
  3. First article testing (Carl and Yi)
  4. Mechanical cooling (Jim)
  5. Temperature compensation (Jack)
  6. Preamp-summing (Fernando)
  7. Discussion

Minutes

Attendees: