Difference between revisions of "February 27, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Thursday February 27, 2020, 2pm At Jefferson Lab, room TED 2504 * Present - == Agenda == * Overall description https://halldweb.jlab.org/DocDB/0...")
 
(Meeting Time and Place =)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
At Jefferson Lab, room TED 2504
 
At Jefferson Lab, room TED 2504
  
* Present -  
+
* Present - Elton, Dave, Stephanie, Llya, Rory (remote)
  
 
== Agenda ==
 
== Agenda ==
 +
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_15,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
 
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
 
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
* Requirements
+
* 3D model
* Concept [[Media:CPP Installation Concept.pdf]]
+
* Things to work out
 +
** Determine location of cable trays under platform
 +
** Complete structural analysis
 +
** Develop installation plan
 +
** Determine location of existing feedthru on North side of dark room
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 +
* Go to hall and look at cable tray locations (Stephanie and Tim)
 +
* Take actual dimensions from Muon chamber in hall (Stephanie, Tim)
 +
* Go inside Dark room to verify what exists and has to be moved (Stephanie, Tim)
 +
* Need space for foil box to cover electronics (Rory will send sketch)
 +
* Dave Lawrence will supply sketches of the complete chamber
 +
* Verify dimensions to racks to get rail as close as we can (Stephanie)
 +
* We can use steel encased lead available at the lab for the US plate. 2" lead and 1/4" steel surrounding it.
 +
* Definitely wish to pursue being able to move the CPP with the FCAL platform

Latest revision as of 15:55, 10 March 2020

Meeting Time and Place =

Thursday February 27, 2020, 2pm At Jefferson Lab, room TED 2504

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Go to hall and look at cable tray locations (Stephanie and Tim)
  • Take actual dimensions from Muon chamber in hall (Stephanie, Tim)
  • Go inside Dark room to verify what exists and has to be moved (Stephanie, Tim)
  • Need space for foil box to cover electronics (Rory will send sketch)
  • Dave Lawrence will supply sketches of the complete chamber
  • Verify dimensions to racks to get rail as close as we can (Stephanie)
  • We can use steel encased lead available at the lab for the US plate. 2" lead and 1/4" steel surrounding it.
  • Definitely wish to pursue being able to move the CPP with the FCAL platform