Difference between revisions of "February 27, 2024 KLONG CPS Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Time and Place == Monday, February 27, 2024, 1pm Hall D Counting House * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim W...")
 
(Agenda)
 
(4 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
== Agenda ==
 
== Agenda ==
  
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting
+
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_12,_2024_KLONG_CPS_Design_Meeting
 
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)
 
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)
 
** Copper Absorber updated [[media:Copper absorber.pdf]]
 
** Copper Absorber updated [[media:Copper absorber.pdf]]
Line 13: Line 13:
 
* De-gaussing of Tagger magnet (all)
 
* De-gaussing of Tagger magnet (all)
 
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)
 
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]
+
* Magnet update (Josh/Stephanie) [[media:CPS Magnet requirements.pdf]]
 
+
  
 
== Minutes ==
 
== Minutes ==
*
+
* Looked at 3D model and discussed the copper absorber geometry and hall layout
 +
* Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models
 +
* The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place
 +
* Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.
 +
* Discussed magnet design progress, Josh and Stephanie are working on details including the coil design
  
 
== Action Items ==
 
== Action Items ==
*
+
* Engineering group to meet separately to progress the detail design of the "decommissioning" section (Tim)
 +
* Josh and Stephanie to continue detail magnet design
 +
* 3D print the copper absorber to ensure we have the geometry correct (Keith/Bobby)
 +
* Run thermal models of the updated absorber geometry (Hovanes/Tim)
 +
* Develop plan for testing the deGauss procedure with Magnet measurement group and send email to Patrizia (Tim)

Latest revision as of 11:55, 26 March 2024

Meeting Time and Place

Monday, February 27, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Looked at 3D model and discussed the copper absorber geometry and hall layout
  • Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models
  • The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place
  • Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.
  • Discussed magnet design progress, Josh and Stephanie are working on details including the coil design

Action Items

  • Engineering group to meet separately to progress the detail design of the "decommissioning" section (Tim)
  • Josh and Stephanie to continue detail magnet design
  • 3D print the copper absorber to ensure we have the geometry correct (Keith/Bobby)
  • Run thermal models of the updated absorber geometry (Hovanes/Tim)
  • Develop plan for testing the deGauss procedure with Magnet measurement group and send email to Patrizia (Tim)