* '''Action Items'''
 
* '''Action Items'''
  
** remove jumper box and cables and bring to F117 for rework - done
+
** Wiring
 
+
*** remove jumper box and cables and bring to F117 for rework - done
** remove current-limiting resistor boxes, bring to F117 for rework - done
+
*** remove current-limiting resistor boxes, bring to F117 for rework - done
 
+
*** minimize summed coil voltage readouts, do most sums in PLC
** minimize summed coil voltage readouts, do most sums in PLC
+
 
*** implement early-warning quench/overvoltage detection in PLC
 
*** implement early-warning quench/overvoltage detection in PLC
 
+
*** add separate readouts of splice and vapor-cooled lead voltages
** add separate readouts of splice and vapor-cooled lead voltages
+
*** combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
 
+
*** match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
** combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
+
** read out voltage taps for quench detection and DAQ using separate resistor chain
 
+
*** will not go to active isolation for the upcoming coil
** match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
+
*** may need active isolation if passive isolation does not work
 +
*** may implement active isolation in the hall
 +
*** update wiring diagrams to "as built"
 +
*** get diagrams and spec sheets to Fernando
 +
*** understand signal clipping and interaction between readout modules, test and replace if necessary
  
 
** Danfysik power supply
 
** Danfysik power supply
 
*** understand ramp-down mechanism
 
*** understand ramp-down mechanism
** UPS on Danfysik boards and contactor
+
*** UPS on Danfysik boards and contactor
** measure fast dump resistors in power supply - done
+
*** measure fast dump resistors in power supply - done
 +
*** eliminate 2V DC offset
 +
*** fix slow dump - done
 +
*** make more copies of full Danfysik power supply manual (get from Steve L)
  
 
** Danfysik quench detector
 
** Danfysik quench detector
Line 23: Line 29:
 
*** revert channels used for splice/leads to normal coil balance mode
 
*** revert channels used for splice/leads to normal coil balance mode
 
*** install test points for gain/offset tuning
 
*** install test points for gain/offset tuning
*** install pots for external balance if needed
+
*** install pots for external balance if unable to eliminate DC offset
 
*** note that max ramp rate in the hall is 10V / 20H = 0.5 A/sec
 
*** note that max ramp rate in the hall is 10V / 20H = 0.5 A/sec
  
** read out voltage taps for quench detection and DAQ using separate resistor chain
+
** USB device
*** will not go to active isolation for the upcoming coil
+
*** install voltage dividers to extend voltage range
*** may need active isolation if passive isolation does not work
+
** rework Zener protection circuit
*** may implement active isolation in the hall
+
 
+
** install voltage divider to extend voltage range of USB device readout
+
 
+
** rework Zener protection circuit on USB device
+
 
+
** update wiring diagrams to "as built"
+
 
+
** get diagrams and spec sheets to Fernando
+
 
+
** make more copies of full Danfysik power supply manual (get from Steve L)
+
 
+
** fix slow dump - done
+
*** contact Steve L concerning spare Danfysik boards for testing slow dump circuits
+
*** contact Danfysik concerning debug strategy
+
 
+
** understand signal clipping and interaction between readout modules, test and replace if necessary
+
  
 
** automated elog entries
 
** automated elog entries

Revision as of 11:50, 19 January 2011

  • Action Items
    • Wiring
      • remove jumper box and cables and bring to F117 for rework - done
      • remove current-limiting resistor boxes, bring to F117 for rework - done
      • minimize summed coil voltage readouts, do most sums in PLC
      • implement early-warning quench/overvoltage detection in PLC
      • add separate readouts of splice and vapor-cooled lead voltages
      • combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
      • match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
    • read out voltage taps for quench detection and DAQ using separate resistor chain
      • will not go to active isolation for the upcoming coil
      • may need active isolation if passive isolation does not work
      • may implement active isolation in the hall
      • update wiring diagrams to "as built"
      • get diagrams and spec sheets to Fernando
      • understand signal clipping and interaction between readout modules, test and replace if necessary
    • Danfysik power supply
      • understand ramp-down mechanism
      • UPS on Danfysik boards and contactor
      • measure fast dump resistors in power supply - done
      • eliminate 2V DC offset
      • fix slow dump - done
      • make more copies of full Danfysik power supply manual (get from Steve L)
    • Danfysik quench detector
      • match and balance resistors
      • revert channels used for splice/leads to normal coil balance mode
      • install test points for gain/offset tuning
      • install pots for external balance if unable to eliminate DC offset
      • note that max ramp rate in the hall is 10V / 20H = 0.5 A/sec
    • USB device
      • install voltage dividers to extend voltage range
    • rework Zener protection circuit
    • automated elog entries
    • A-B HMI improvements
      • additional HMI license, get second computer working
      • dual-redundant HMI server or another machine for the server
      • HMI development machine and license
      • contact A-B salesman about licenses
      • change HMI database
      • more pre-defined trend plots
      • more HMI screens (may need license upgrade)
      • simplify existing screens
    • A-B PLC program improvements
      • simplify many operations
      • improve PLC early problem detection
      • improve PLC cryo control under varying CTF operating conditions
    • improve cryo system
      • minimize ice buildup
      • more heating/insulation on N2 vent line
      • do we need cold traps?
      • do we need additional valves, check valves, bypasses, whatever?
      • can we calibrate the C-glass sensors somehow?



  • Basic questions
    • what is causing blockage in vapor-cooled lead?
      • broken valve!
    • lag between field and current...are there turn-to-turn shorts in coil 1?
      • maybe short, maybe eddy currents
    • what worked, what didn't for coil 1?
    • what should we do differently for the next coil?
      • will we open up coils 3 and 4?
    • what might we consider doing differently in the hall?
    • do we want an independent review of our fast (and slow) dump strategy and system?
    • have we documented our experience?
    • sub-coil inductances
      • measure with inductance meter on the platform
      • inductance seen on splices
    • USB and other device wiring problems
      • noise
      • better indication of what caused fast/slow dumps -- either LED Panel or bits to the PLC