Difference between revisions of "For the second coil"

From GlueXWiki
Jump to: navigation, search
m
m
Line 2: Line 2:
  
 
* Wiring
 
* Wiring
** remove jumper box and cables and bring to F117 for rework - done
+
** remove jumper box and cables and bring to F117 for rework - '''done'''
** remove current-limiting resistor boxes, bring to F117 for rework - done
+
** remove current-limiting resistor boxes, bring to F117 for rework - '''done'''
** minimize summed coil voltage readouts, do most sums in PLC - done
+
** minimize summed coil voltage readouts, do most sums in PLC - '''done'''
** add separate readouts of splice and vapor-cooled lead voltages - done
+
** add separate readouts of splice and vapor-cooled lead voltages - '''done'''
 
** combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
 
** combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
** match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors - done
+
** match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors - '''done'''
** read out voltage taps for quench detection and DAQ using separate resistor chain - done
+
** read out voltage taps for quench detection and DAQ using separate resistor chain - '''done'''
 
** update wiring diagrams to "as built"
 
** update wiring diagrams to "as built"
** get diagrams and spec sheets to Fernando - done
+
** get diagrams and spec sheets to Fernando - '''done'''
 
** understand signal clipping and interaction between readout modules, test and replace if necessary
 
** understand signal clipping and interaction between readout modules, test and replace if necessary
 
** minimize noise
 
** minimize noise
  
 
* Danfysik power supply
 
* Danfysik power supply
** understand ramp-down mechanism - done
+
** understand ramp-down mechanism - '''done'''
** measure fast dump resistors in power supply - done
+
** measure fast dump resistors in power supply - '''done'''
 
** eliminate 2V DC offset
 
** eliminate 2V DC offset
 
** fix slow dump
 
** fix slow dump
Line 22: Line 22:
  
 
* Danfysik quench detector
 
* Danfysik quench detector
** match and balance resistors - done
+
** match and balance resistors - '''done'''
** install test points for gain/offset tuning - done
+
** install test points for gain/offset tuning - '''done'''
 
** install pots for balance
 
** install pots for balance
 
** install bias circuit if unable to eliminate Danfysik DC offset
 
** install bias circuit if unable to eliminate Danfysik DC offset
Line 42: Line 42:
 
** HMI development machine and license
 
** HMI development machine and license
 
** contact A-B salesman about licenses
 
** contact A-B salesman about licenses
** change HMI database to MySql - done
+
** change HMI database to MySql - '''done'''
 
*** more pre-defined trend plots
 
*** more pre-defined trend plots
 
** more HMI screens (may need license upgrade)
 
** more HMI screens (may need license upgrade)

Revision as of 10:26, 27 January 2011

To-do list

  • Wiring
    • remove jumper box and cables and bring to F117 for rework - done
    • remove current-limiting resistor boxes, bring to F117 for rework - done
    • minimize summed coil voltage readouts, do most sums in PLC - done
    • add separate readouts of splice and vapor-cooled lead voltages - done
    • combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
    • match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors - done
    • read out voltage taps for quench detection and DAQ using separate resistor chain - done
    • update wiring diagrams to "as built"
    • get diagrams and spec sheets to Fernando - done
    • understand signal clipping and interaction between readout modules, test and replace if necessary
    • minimize noise
  • Danfysik power supply
    • understand ramp-down mechanism - done
    • measure fast dump resistors in power supply - done
    • eliminate 2V DC offset
    • fix slow dump
    • make more copies of full Danfysik power supply manual (get from Steve L)
  • Danfysik quench detector
    • match and balance resistors - done
    • install test points for gain/offset tuning - done
    • install pots for balance
    • install bias circuit if unable to eliminate Danfysik DC offset
      • review needed?
  • Dataforth system
    • Correct for 2M Ohm internal impedance and 200k Ohm resistors in voltage tap readouts
  • USB device
    • install voltage dividers to extend voltage range
    • add resistors to Zener protection circuit
  • automated elog entries
  • A-B HMI improvements
    • additional HMI license, get second computer working
    • dual-redundant HMI server or another machine for the server
    • HMI development machine and license
    • contact A-B salesman about licenses
    • change HMI database to MySql - done
      • more pre-defined trend plots
    • more HMI screens (may need license upgrade)
    • simplify existing screens
    • better indication of what caused fast/slow dump
  • A-B PLC program improvements
    • new channels
    • simplify many operations
    • improve PLC early problem detection
    • improve PLC cryo control under varying CTF operating conditions
    • implement early-warning quench/overvoltage detection in PLC
  • EPICS
    • serve out all PLC channels to CA
      • need list from Josh
    • implement guard shack notification for IOC crash
  • improve cryo system
    • minimize ice buildup
    • more heating/insulation on N2 vent line
    • can we calibrate the C-glass sensors somehow?


For the hall

  • UPS on Danfysik boards and contactor
  • may implement active isolation depending on test results
  • max ramp rate in the hall is 10V / 20H = 0.5 A/sec
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?


Basic questions

  • what is causing blockage in vapor-cooled lead?
    • broken valve!
  • lag between field and current...are there turn-to-turn shorts in coil 1?
    • maybe short, maybe eddy currents
  • what worked, what didn't for coil 1?
  • what should we do differently for the next coil?
    • will we open up coils 3 and 4?
  • what might we consider doing differently in the hall?
    • do we want an independent review of our fast (and slow) dump strategy and system?
  • have we documented our experience?
  • sub-coil inductances
    • measure with inductance meter on the platform
    • inductance seen on splices