Line 3: Line 3:
  
 
* Wiring
 
* Wiring
 +
** rewire for coil 3 subcoils
 +
** switch to 20k protection resistors for coil taps if needed
 
** eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
 
** eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
 
** understand induced voltages on taps during testing
 
** understand induced voltages on taps during testing
** switch to 20k protection resistors for coil taps?
 
 
** understand noise, signal clipping and interaction between modules
 
** understand noise, signal clipping and interaction between modules
  
Line 12: Line 13:
 
** fix broken transistor
 
** fix broken transistor
 
** commission fault sequencer
 
** commission fault sequencer
 +
** fix slow dump
 
** understand ramp-down mechanism
 
** understand ramp-down mechanism
 
** understand varying fast dump time constant
 
** understand varying fast dump time constant
** fix slow dump
+
** choose ground fault detection mechanism
** choose ground fault detection compatible with quench detector
+
  
  
Line 24: Line 25:
 
* Instrumentation
 
* Instrumentation
 
** ensure all devices on clean power
 
** ensure all devices on clean power
** check out Newport controllers, flow switch
+
** check out Newport controllers, flow switch, replace if needed
 
** implement system to isolate fault detectors and determine time sequence of trips
 
** implement system to isolate fault detectors and determine time sequence of trips
 
** understand spikes on shunt Newport
 
** understand spikes on shunt Newport

Revision as of 13:08, 17 March 2011

To-do list


  • Wiring
    • rewire for coil 3 subcoils
    • switch to 20k protection resistors for coil taps if needed
    • eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
    • understand induced voltages on taps during testing
    • understand noise, signal clipping and interaction between modules


  • Danfysik power supply
    • fix broken transistor
    • commission fault sequencer
    • fix slow dump
    • understand ramp-down mechanism
    • understand varying fast dump time constant
    • choose ground fault detection mechanism


  • Danfysik quench detector
    • implement divider circuit upstream of QD to eliminate effects of coil imbalances


  • Instrumentation
    • ensure all devices on clean power
    • check out Newport controllers, flow switch, replace if needed
    • implement system to isolate fault detectors and determine time sequence of trips
    • understand spikes on shunt Newport
    • understand effect of B field on all sensors, move devices if needed
    • monitor circuit breakers?


  • NI USB device
    • rework Zener/divider box, needs to be fully bipolar
    • eliminate noise


  • A-B HMI improvements
    • upgrade to 100 screen license
    • implement fault sequence screens


  • A-B PLC program improvements
    • use custom ("add-on") instructions to simplify code


  • EPICS


  • EWEB screens
    • update for latest tags and drawings


For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • should we install a UPS on the Danfysik contactor and control boards?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?
  • should we monitor all relays?
  • what is the effect of B field on sensors/relays? should some instrumentation be relocated?