Difference between revisions of "For the third coil"

From GlueXWiki
Jump to: navigation, search
m
m
Line 76: Line 76:
 
* what is the effect of B field on sensors/relays?  should some instrumentation be relocated?
 
* what is the effect of B field on sensors/relays?  should some instrumentation be relocated?
 
* lock box for power supply key
 
* lock box for power supply key
 +
* more ethernet power strips

Revision as of 10:57, 24 March 2011

To-do list


  • Wiring
    • rewire for coil 3 subcoils
    • 20 kOhm protection resistors for coil taps if needed for quench detector balancing
    • eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
    • understand induced voltages on taps during testing
    • understand noise, signal clipping and interaction between modules
    • document trip chains
    • label circuit breakers


  • Danfysik power supply
    • fix broken transistor
    • commission fault sequencer
    • fix slow dump
    • understand ramp-down mechanism
    • understand varying fast dump time constant
    • choose ground fault detection mechanism
    • cover holes in cabinet


  • Danfysik quench detector
    • implement divider circuit upstream of QD to eliminate effect of coil imbalances
    • install trip test points


  • Instrumentation
    • ensure all devices on clean power with good grounds
    • check out Newport controllers, flow switch, replace if needed
    • implement system to isolate fault detectors and determine time sequence of trips
    • understand spikes on shunt Newport
    • understand effect of B field on all sensors, move devices if needed
    • monitor circuit breakers?


  • NI USB device
    • rework Zener/divider box, needs to be fully bipolar
    • eliminate noise


  • VME-based fast DAQ
    • get hardware, test in lab
    • write software, test in lab
    • connect to apparatus
    • commission


  • A-B HMI improvements
    • upgrade to 100 screen license
    • implement fault sequence screens if system implemented


  • A-B PLC program improvements
    • use custom ("add-on") instructions to simplify code


  • EPICS


  • EWEB screens
    • update for latest tags and drawings


For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • should we install a UPS on the Danfysik contactor and control boards?
  • should we install a second contactor in the Danfysik power supply?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?
  • should we monitor all relays?
  • what is the effect of B field on sensors/relays? should some instrumentation be relocated?
  • lock box for power supply key
  • more ethernet power strips