Difference between revisions of "For the third coil"

From GlueXWiki
Jump to: navigation, search
m
m
Line 4: Line 4:
 
* Wiring
 
* Wiring
 
** rewire for coil 3 subcoils
 
** rewire for coil 3 subcoils
** 20 kOhm protection resistors for coil taps if needed for quench detector balancing - not needed 7-Apr-2011
+
** 20 kOhm protection resistors for coil taps if needed for quench detector balancing - '''not needed 7-Apr-2011'''
 
** eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
 
** eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
 
** understand induced voltages on taps during testing
 
** understand induced voltages on taps during testing
Line 23: Line 23:
  
 
* Danfysik quench detector
 
* Danfysik quench detector
** implement divider circuit upstream of QD to eliminate effect of coil imbalances - not needed 7-Apr-2011
+
** install bias pot on remaining three channels - '''done 7-Apr-2011'''
 +
** implement divider circuit upstream of QD to eliminate effect of coil imbalances - '''not needed 7-Apr-2011'''
 
** install trip test points
 
** install trip test points
  
Line 36: Line 37:
  
  
* NI USB device - replaced by VME DAQ system 7-Apr-2011
+
* NI USB device - '''replaced by VME DAQ system 7-Apr-2011'''
 
** rework Zener/divider box, needs to be fully bipolar
 
** rework Zener/divider box, needs to be fully bipolar
 
** eliminate noise
 
** eliminate noise
Line 42: Line 43:
  
 
* VME-based fast DAQ
 
* VME-based fast DAQ
** get hardware, test in lab - done 7-Apr-2011
+
** get hardware, test in lab - '''done 7-Apr-2011'''
 
** write software, test in lab
 
** write software, test in lab
 
** connect to apparatus
 
** connect to apparatus

Revision as of 14:18, 7 April 2011

To-do list


  • Wiring
    • rewire for coil 3 subcoils
    • 20 kOhm protection resistors for coil taps if needed for quench detector balancing - not needed 7-Apr-2011
    • eliminiate pickup on downstream lead/splice and other channels (esp. during dump)
    • understand induced voltages on taps during testing
    • understand noise, signal clipping and interaction between modules
    • document trip chains
    • label circuit breakers


  • Danfysik power supply
    • fix broken transistor
    • commission fault sequencer
    • fix slow dump
    • understand ramp-down mechanism
    • understand varying fast dump time constant
    • choose ground fault detection mechanism
    • cover holes in cabinet


  • Danfysik quench detector
    • install bias pot on remaining three channels - done 7-Apr-2011
    • implement divider circuit upstream of QD to eliminate effect of coil imbalances - not needed 7-Apr-2011
    • install trip test points


  • Instrumentation
    • ensure all devices on clean power with good grounds
    • check out Newport controllers, flow switch, replace if needed
    • implement system to isolate fault detectors and determine time sequence of trips
    • understand spikes on shunt Newport
    • understand effect of B field on all sensors, move devices if needed
    • monitor circuit breakers?


  • NI USB device - replaced by VME DAQ system 7-Apr-2011
    • rework Zener/divider box, needs to be fully bipolar
    • eliminate noise


  • VME-based fast DAQ
    • get hardware, test in lab - done 7-Apr-2011
    • write software, test in lab
    • connect to apparatus
    • commission


  • A-B HMI improvements
    • upgrade to 100 screen license
    • implement fault sequence screens if system implemented


  • A-B PLC program improvements


  • EPICS


  • EWEB screens
    • update for latest tags and drawings


For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • should we install a UPS on the Danfysik contactor and control boards?
  • should we install a second contactor in the Danfysik power supply?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?
  • should we monitor all relays?
  • what is the effect of B field on sensors/relays? should some instrumentation be relocated?
  • lock box for power supply key
  • more ethernet power strips
  • use custom ("add-on") instructions to simplify PLC code