For the third coil

From GlueXWiki
Revision as of 10:46, 10 March 2011 by Wolin (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

To-do list

  • Wiring
    • checkout, understand noise, signal clipping and interaction between modules


  • Danfysik power supply
    • understand ramp-down mechanism
    • fix slow dump
    • choose ground fault detection compatible with quench detector


  • Danfysik quench detector


  • Dataforth system


  • USB device
    • rework Zener/divider box



  • A-B HMI improvements
    • upgrade to 100 screen license


  • A-B PLC program improvements
    • use custom ("add-on") instructions to simplify code


  • EPICS


  • EWEB screens
    • update for latest tags and drawings



For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • should we install a UPS on the Danfysik contactor and control boards?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?
  • should we monitor all relays?
  • effect of B field on sensors/relays?