To-do list
- Wiring
- checkout, understand noise, signal clipping and interaction between modules
- Danfysik power supply
- understand ramp-down mechanism
- fix slow dump
- choose ground fault detection compatible with quench detector
- Danfysik quench detector
- Dataforth system
- USB device
- rework Zener/divider box
- A-B HMI improvements
- upgrade to 100 screen license
- A-B PLC program improvements
- use custom ("add-on") instructions to simplify code
- EPICS
- EWEB screens
- update for latest tags and drawings
For the hall
- note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
- should we install a UPS on the Danfysik contactor and control boards?
- do we need additional valves, check valves, bypasses, whatever?
- do we need Dataforth voltage attenuators on coil tap channels?
- do we need active isolation of coil tap channels, etc?
- should we monitor all circuit breakers?
- should we monitor all relays?
- effect of B field on sensors/relays?