GlueX Data Challenge Meeting, September 10, 2012
GlueX Data Challenge Meeting
Monday, September 10, 2012
1:30 pm, EDT
JLab: CEBAF Center, F326/327
Agenda
- Minutes from last time
- JLab Farm Mini-Challenge Status
- Volatile disk reserve back to 10 TB
- Tape volume set will expand as necessary
- OSG Challenge Status
- Collaboration Meeting
Meeting Connections
To connect from the outside:
- ESNET:
- Call ESNET Number 8542553 (this is the preferred connection method).
- Phone: (should not be needed)
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- or www.readytalk.com
- then type access code 3421244 into "join a meeting" (you need java plugin)
- EVO:
- A conference has been booked under "GlueX" from 1:00pm until 3:30pm (EST).
- Direct meeting link
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 13 9993
- Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Minutes
Present:
- CMU: Curtis Meyer
- EVO: Matt Shepherd
- FSU: Nathan Sparks
- JLab: Eugene Chudakov, Mark Ito (chair), David Lawrence, Simon Taylor
- UConn: Richard Jones
JLab Farm Mini-Challenge Status
Mark presented the current status of the mini data challenge. See his wiki page for details. Nearly all of the 1000 data files have been generated and reconstructed, although there were failures in a few percent of them. He outlined the future work left to do. He will be starting another run soon.
Richard reported on event size and a study of how much of that size is Monte Carlo information that will not be present in the real raw data.
cut out non-essential information for reconstruction cheat info woven into the data tof, mctag data model review
stuff passed under the table
size take 9 gev, b1pi events, size of full events 117 kB strip out all truth that is recognizable, goes to 55 kB 50 mc 50 data just hits 40% inflation with mcsmear, unstripped
five slides on OSG at collab. meeting