Difference between revisions of "GlueX Start Counter Meeting, April 7, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
Line 32: Line 32:
  
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ . You have to be a member of the "halld" Unix group to do this.
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ . You have to be a member of the "halld" Unix group to do this.
 +
 +
=Minutes=
 +
 +
JLab: Mark
 +
FIU:
 +
 +
oscillations
 +
finish testing single cell
 +
will go to array, 16 cell
 +
timing resolution with rate not good
 +
 +
Lei contact with plastic craft,
 +
should get scinitillator in a few weeks
 +
constant fraction discriminator from Beni
 +
 +
organizational change in structure of college, that may have to be adjusted
 +
 +
test some start counters with daq set-up used for microscope test, parasitic, under tagger, during
 +
HD-ice run
 +
perhaps after shutdown,

Revision as of 09:07, 8 April 2011

Location, Time

Thursday, April 7, 2011
3:30 pm EDT
JLab: CEBAF Center, Room F326/7

Agenda

  1. Announcements
  2. Review minutes from previous meeting: all
  3. Start Counter News
  4. MOU status

Communication Information

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ . You have to be a member of the "halld" Unix group to do this.

Minutes

JLab: Mark FIU:

oscillations finish testing single cell will go to array, 16 cell timing resolution with rate not good

Lei contact with plastic craft, should get scinitillator in a few weeks constant fraction discriminator from Beni

organizational change in structure of college, that may have to be adjusted

test some start counters with daq set-up used for microscope test, parasitic, under tagger, during HD-ice run perhaps after shutdown,