Difference between revisions of "GlueX Start Counter Meeting, January 10, 2013"

From GlueXWiki
Jump to: navigation, search
(Minutes: present)
(Minutes)
Line 31: Line 31:
 
* '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser
 
* '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Sascha Somov, Beni Zihlmann
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Sascha Somov, Beni Zihlmann
 
+
==Announcements==
 +
==Review minutes from previous meeting==
 
discussion on drawings
 
discussion on drawings
 
+
==Counter Construction==
 
email to chuck hurlburt, talked to guy who would run this project, proposal will be done
 
email to chuck hurlburt, talked to guy who would run this project, proposal will be done
  
Line 39: Line 40:
 
get a counter through
 
get a counter through
 
working also on design of assembly jig
 
working also on design of assembly jig
 
+
==SiPM read-out status==
 
got st-2 board returned from fernando
 
got st-2 board returned from fernando
 
not tested yet
 
not tested yet
Line 52: Line 53:
 
looking at low signal end
 
looking at low signal end
 
change
 
change
 
ask Jarrod about deadline
 
  
 
600 sipms have been received
 
600 sipms have been received
 
three  counter electronics
 
three  counter electronics
 +
==Contract==
  
<end of note>
+
ask Jarrod about deadline

Revision as of 16:11, 22 January 2013

GlueX Start Counter Meeting
Thursday, January 10, 2013
10 am EST
JLab: CEBAF Center F326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Counter Construction
  4. SiPM read-out status
  5. Light collection study status
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Sascha Somov, Beni Zihlmann

Announcements

Review minutes from previous meeting

discussion on drawings

Counter Construction

email to chuck hurlburt, talked to guy who would run this project, proposal will be done

mcneal, if bent scintillator, is that OK get a counter through working also on design of assembly jig

SiPM read-out status

got st-2 board returned from fernando not tested yet gain measurement new student next week, will work on testing

start with phototube, measure gain measure a source get a number of p. e. measure with sipm number of photoelectrons, work on typical signal size need timing and amplitude information , need to do walk correction looking at low signal end change

600 sipms have been received three counter electronics

Contract

ask Jarrod about deadline