Difference between revisions of "GlueX Start Counter Meeting, January 24, 2013"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
Line 23: Line 23:
  
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2013-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2013-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .
 +
 +
=Minutes=
 +
 +
New Note 41
 +
 +
same numbers from mcneal
 +
cables
 +
some cables for testing
 +
testing
 +
complete test possible
 +
30 counter test as a working assumption
 +
five counters from eljen
 +
ej 200 strips
 +
not ej212 as before
 +
dimentsions 3 mm x
 +
5 strips
 +
10:10
 +
with practice runs $196 per scchint
 +
width less than 30 mm
 +
matter of days once order is placed
 +
chuck will look into shipping assurance

Revision as of 11:27, 28 January 2013

GlueX Start Counter Meeting
Thursday, January 24, 2013
10 am EST
JLab: CEBAF Center L207 (non-standard room)

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Counter Construction
  4. SiPM read-out status
  5. Light collection study status
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

New Note 41

same numbers from mcneal cables some cables for testing testing complete test possible 30 counter test as a working assumption five counters from eljen ej 200 strips not ej212 as before dimentsions 3 mm x 5 strips 10:10 with practice runs $196 per scchint width less than 30 mm matter of days once order is placed chuck will look into shipping assurance