Line 29: Line 29:
 
* '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser
 
* '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser
 
* '''JLab''': Chuck Hutton, Mark Ito (chair)
 
* '''JLab''': Chuck Hutton, Mark Ito (chair)
 +
 +
==Review minutes from previous meeting==
 +
 +
==Counter Construction==
  
 
same numbers from mcneal
 
same numbers from mcneal
Line 46: Line 50:
 
matter of days once order is placed
 
matter of days once order is placed
 
chuck will look into shipping assurance
 
chuck will look into shipping assurance
 +
 +
==Contract==

Revision as of 14:20, 28 January 2013

GlueX Start Counter Meeting
Thursday, January 24, 2013
10 am EST
JLab: CEBAF Center L207 (non-standard room)

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Counter Construction
  4. SiPM read-out status
  5. Light collection study status
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
  • JLab: Chuck Hutton, Mark Ito (chair)

Review minutes from previous meeting

Counter Construction

same numbers from mcneal cables some cables for testing testing complete test possible 30 counter test as a working assumption five counters from eljen ej 200 strips not ej212 as before dimentsions 3 mm x 5 strips 10:10 with practice runs $196 per scchint width less than 30 mm matter of days once order is placed chuck will look into shipping assurance

Contract