* '''JLab''': Chuck Hutton, Mark Ito (chair)
 
* '''JLab''': Chuck Hutton, Mark Ito (chair)
  
==Review minutes from previous meeting==
+
==Contract==
 +
 
 +
The proposal from FIU is past due. On the other hand, Mark has exchanged email with Jarrod Fitzpatrick, and this situation seems less than dire. Werner thinks that he can come up with a draft Procedures and QA plan by Monday. Mark agreed to review the plan.
  
 
==Counter Construction==
 
==Counter Construction==
  
same numbers from mcneal
+
Eric is in contact with Chuck Hurlbut at Eljen and Robert McNeal (at McNeal) and is getting quotes on their respective construction steps. The cost from McNeal should be about the same as for the previous prototypes.
cables
+
 
some cables for testing
+
Werner asked about cables for testing the counters. Mark told us that his understanding is that JLab will supply the cables. Mark will confirm that with Fernando. We decided that we would make a tentative plan to try to test all thirty counters at once at FIU. That will drive plans for lending electronics and for manufacturing cables in advance of installation in the Hall.
testing
+
 
complete test possible
+
Eric reported that Eljen is suggesting that we use EJ-200 rather than the EJ-212 we had planned for originally.
30 counter test as a working assumption
+
 
 
five counters from eljen
 
five counters from eljen
 
ej 200 strips
 
ej 200 strips

Revision as of 21:03, 28 January 2013

GlueX Start Counter Meeting
Thursday, January 24, 2013
10 am EST
JLab: CEBAF Center L207 (non-standard room)

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Counter Construction
  4. SiPM read-out status
  5. Light collection study status
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2013-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2013-1Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
  • JLab: Chuck Hutton, Mark Ito (chair)

Contract

The proposal from FIU is past due. On the other hand, Mark has exchanged email with Jarrod Fitzpatrick, and this situation seems less than dire. Werner thinks that he can come up with a draft Procedures and QA plan by Monday. Mark agreed to review the plan.

Counter Construction

Eric is in contact with Chuck Hurlbut at Eljen and Robert McNeal (at McNeal) and is getting quotes on their respective construction steps. The cost from McNeal should be about the same as for the previous prototypes.

Werner asked about cables for testing the counters. Mark told us that his understanding is that JLab will supply the cables. Mark will confirm that with Fernando. We decided that we would make a tentative plan to try to test all thirty counters at once at FIU. That will drive plans for lending electronics and for manufacturing cables in advance of installation in the Hall.

Eric reported that Eljen is suggesting that we use EJ-200 rather than the EJ-212 we had planned for originally.

five counters from eljen ej 200 strips not ej212 as before dimentsions 3 mm x 5 strips 10:10 with practice runs $196 per scchint width less than 30 mm matter of days once order is placed chuck will look into shipping assurance

Contract