Difference between revisions of "GlueX TOF Meeting, January 29, 2020"
From GlueXWiki
(adjusted) |
m (→Calibration) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
Wednesday, January 29, 2020<br> | Wednesday, January 29, 2020<br> | ||
10:00 am EST<br> | 10:00 am EST<br> | ||
− | JLab: | + | JLab: TEDF, Room 2561b<br> |
BlueJeans: [http://bluejeans.com/350531998 350 531 998] | BlueJeans: [http://bluejeans.com/350531998 350 531 998] | ||
Line 13: | Line 13: | ||
# TOF NIM paper | # TOF NIM paper | ||
# Action Item Recap | # Action Item Recap | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | Present: | ||
+ | |||
+ | * ''' FSU: ''' Edmundo Barriga | ||
+ | * ''' JLab: ''' Mark Ito, Sasha Ostrovidov, Beni Zihlmann | ||
+ | |||
+ | === Calibration === | ||
+ | |||
+ | Beni reported on the calibration of the current run. | ||
+ | |||
+ | * The code works now with the new geometry. | ||
+ | * He has gone through the steps of the procedure multiple times. | ||
+ | * There still may be some checks to do on the code. | ||
+ | * The walk correction is key: without a good walk correction subsequent steps are useless. | ||
+ | * A reconstruction job using the new constants was tried. Pions greater than 1.0 GeV/c are required to match TOF points to within 13 cm in x and y. Many histograms are empty, some only partially filled. This is work in progress. | ||
+ | |||
+ | === NIM Paper === | ||
+ | |||
+ | Sasha reports that work continues on the NIM paper, though not at a blazing fast pace. Further discussion is needed. |
Latest revision as of 11:44, 4 February 2020
GlueX Time-of-Flight Meeting
Wednesday, January 29, 2020
10:00 am EST
JLab: TEDF, Room 2561b
BlueJeans: 350 531 998
Contents
Agenda
- Announcements
- Review of minutes from the last meeting
- Detector Status
- Software Issues
- TOF NIM paper
- Action Item Recap
Minutes
Present:
- FSU: Edmundo Barriga
- JLab: Mark Ito, Sasha Ostrovidov, Beni Zihlmann
Calibration
Beni reported on the calibration of the current run.
- The code works now with the new geometry.
- He has gone through the steps of the procedure multiple times.
- There still may be some checks to do on the code.
- The walk correction is key: without a good walk correction subsequent steps are useless.
- A reconstruction job using the new constants was tried. Pions greater than 1.0 GeV/c are required to match TOF points to within 13 cm in x and y. Many histograms are empty, some only partially filled. This is work in progress.
NIM Paper
Sasha reports that work continues on the NIM paper, though not at a blazing fast pace. Further discussion is needed.