Difference between revisions of "GlueX TOF Meeting, March 11, 2020"
From GlueXWiki
(first draft) |
m (→Calibration) |
||
(One intermediate revision by the same user not shown) | |||
Line 13: | Line 13: | ||
# TOF NIM paper | # TOF NIM paper | ||
# Action Item Recap | # Action Item Recap | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | Present: | ||
+ | |||
+ | * ''' FSU: ''' Edmundo Barriga | ||
+ | * ''' JLab: ''' Mark Ito, Simon Taylor | ||
+ | |||
+ | === Calibration === | ||
+ | |||
+ | Beni Zihlmann has largely completed calibrations for the current run. He ran into a situation where the ADC channel for one PMT developed a problem. Unfortunately that PMT was for the one paddle that Beni uses as a common reference for all of the other paddles in the other plane. This caused very poor resolution in the online monitoring plots. The ADC has been replaced and TOF timing resolution is back to nominal values. |
Latest revision as of 20:43, 24 March 2020
GlueX Time-of-Flight Meeting
Wednesday, March 11, 2020
10:00 am EDT
JLab: TEDF, Room 2561b
BlueJeans: 350 531 998
Agenda
- Announcements
- Review of minutes from the last meeting
- Detector Status
- Software Issues
- TOF NIM paper
- Action Item Recap
Minutes
Present:
- FSU: Edmundo Barriga
- JLab: Mark Ito, Simon Taylor
Calibration
Beni Zihlmann has largely completed calibrations for the current run. He ran into a situation where the ADC channel for one PMT developed a problem. Unfortunately that PMT was for the one paddle that Beni uses as a common reference for all of the other paddles in the other plane. This caused very poor resolution in the online monitoring plots. The ADC has been replaced and TOF timing resolution is back to nominal values.